109 AW - Repair Building 2A Sewer Line, Restrooms, and Lockers
SOL #: W50S8J26Q0001Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
W7NR USPFO ACTIVITY NYANG 109
SCOTIA, NY, 12302-9572, United States
Place of Performance
Schenectady, NY
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Repair Or Alteration Of Office Buildings (Z2AA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 20, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 27, 2026, 2:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The 109th Airlift Wing is soliciting quotes for construction services to repair the main sewer line and renovate associated facilities in Building 2A at Stratton Air National Guard Base, Scotia, New York. This is a Combined Synopsis/Solicitation (RFQ) with a project magnitude between $750,000 and $1,000,000. Quotes are due by 10:00 AM EDT on April 27, 2026.
Scope of Work
The project involves comprehensive repairs and renovations:
- Base Scope: Replacement of approximately 142 linear feet of sewer pipe, 27 plumbing fixtures, asbestos abatement in the women's locker room, and renovation of affected restrooms, showers, and lounge areas.
- Option 1: Repair and retiling of an approximately 2,784 sq ft corridor.
- Option 2: Renovation of the 1,200 sq ft male locker room, including asbestos abatement.
- Key Clarifications (from RFI Log): New wall installations for splitting rooms are removed from the scope; the entire locker room will be abated and repaired uniformly. Specific flooring materials are detailed (e.g., 18x18 Moonrock Ceramic Emboss Luxury Vinyl Tile for lounge, 12x24 Honed Crossville tile for restrooms). The contractor must verify existing sewer line depth and agree on the outfall method with the COR. Debris disposal must be offsite with a manifest.
Contract Details
- Contract Type: Firm-Fixed Price (RFQ).
- Set-Aside: 100% Total Small Business Set-Aside (NAICS 236220, size standard $45.0M).
- Period of Performance: 120 days following the Notice to Proceed (NTP), with work starting within 14 days of NTP.
- Place of Performance: Stratton Air National Guard Base, Scotia, NY.
- Bonds: Performance and payment bonds are mandatory within 10 calendar days after award.
- Wage Rates: Construction Wage Rates per General Decision Number NY20260002 – 01/30/2026 for Schenectady County, New York are applicable.
- Funding: Funds are not presently available but are anticipated prior to award. No contract award will be made until appropriated funds are available.
Submission & Evaluation
- Submission: Electronically to 109.aw.fal.msc.contracting@us.af.mil.
- Quote Due: 10:00 AM EDT on 27 April 2026.
- Pricing: Must be provided for all line items (Base Scope, Option 1, Option 2) and valid for 90 days.
- Evaluation Factors: Award will be made to the offeror representing the best value to the Government, based on Price, Technical capability, and Past Performance (per FAR 52.212-2).
- Amendments: Contractors must acknowledge receipt of the 20 April 2026 amendment (RFI Log) with their quote submission.
Important Notes
A site visit was held on April 15, 2026. All RFQ-related information and amendments will be posted on SAM.gov. Questions must be submitted in writing via email.
People
Points of Contact
Joshua KingPRIMARY
Nicholas BastianiSECONDARY