12-ID High Heat Load Mirror System

SOL #: 6-S176-Q-00096-00Solicitation

Overview

Buyer

Energy
Energy, Department Of
ARGONNE NATL LAB - DOE CONTRACTOR
Lemont, IL, 60439, United States

Place of Performance

Lemont, IL

NAICS

Other Professional Equipment and Supplies Merchant Wholesalers (423490)

PSC

Laboratory Equipment And Supplies (6640)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 17, 2025
2
Last Updated
Feb 10, 2026
3
Submission Deadline
Feb 13, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Argonne National Laboratory, a U.S. Department of Energy contractor, is seeking proposals for the design, manufacture, testing, delivery, and installation of a 12-ID High Heat Load Mirror System for the Advanced Photon Source (APS) beamline. This Firm Fixed-Price contract will be awarded based on Best Value/Trade-Off criteria. Proposals are due by February 13, 2026, at 3:00 PM CST.

Scope of Work

The required mirror system includes a support structure, vacuum chamber, and mirror supporting mechanisms. Key components are a bendable mirror with three reflective coatings (palladium, silicon, platinum) designed for high reflectivity at 6-35 KeV. The system requires three motorized motions (X, Y, and pitch rotation) for beam centering and surface selection, with options for fine-tuning via PZT actuators. It also includes a water-cooled mask and Compton shields. The system must mount onto an existing optical table within specified space constraints.

Performance Requirements

Strict performance standards include mirror surface figure errors (tangential and sagittal slope, RMS height, micro-roughness), thermal induced slope error less than 0.1 urad, vibration performance with a lowest natural frequency greater than 100 Hz, and vacuum specifications requiring a base pressure less than 1x10-7 Torr. All components must be compatible with high vacuum (HV) standards and the radiation environment.

Contract Details & Timeline

  • Contract Type: Firm Fixed Price
  • Delivery: Mirror system must arrive at APS no later than 52 weeks after contract award. On-site assembly, installation, and testing will be performed by the vendor.
  • Set-Aside: None specified.
  • Proposal Due: February 13, 2026, at 3:00 PM CST.
  • Submission: Via email to Molly Hunter (mollyhunter@anl.gov).
  • Questions Deadline: January 4, 2026, 3:00 PM CST (passed).

Evaluation Criteria

Proposals will be evaluated using a Best Value/Trade-Off methodology, considering:

  • Technical Approach: Alignment with SOW technical specifications, including optical substrate, motion, tolerance, and vacuum requirements.
  • Past Performance: Demonstrated experience providing similar equipment and services, requiring three past contracts within the last five years.
  • Proposal Risk: Assessment of the offeror's understanding of the scope, ability to perform successfully, and capacity for lifetime service and support.
  • Cost or Price: All other evaluation factors combined are approximately equal to cost or price.

Special Conditions & Notes

Bidders must adhere to Argonne's Terms and Conditions, including specific FAR/DEAR clauses, intellectual property provisions, and on-site supplemental conditions for moderate risk work. These include requirements for indemnity, insurance, and extensive Environment, Safety, and Health (ES&H) protocols for any on-site activities at Lemont, IL. Extensive documentation, Factory Acceptance Tests (FAT), and compliance with APS Engineering Standard Vacuum Designs are mandatory.

People

Points of Contact

Molly HunterPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: Feb 10, 2026
View
Version 2Viewing
Solicitation
Posted: Jan 9, 2026
Version 1
Solicitation
Posted: Dec 17, 2025
View