127EAW26Q0011 - GAOA, Lassen NF Toilet Replacement

SOL #: 127EAW26Q0011Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 6
Albuquerque, NM, 871023498, United States

Place of Performance

Mineral, CA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Recreational Buildings (Y1FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 30, 2026
2
Submission Deadline
May 1, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, CSA Southwest 6, is soliciting proposals for the GAOA, Lassen NF Toilet Replacement project (Solicitation #127EAW26Q0011). This Total Small Business Set-Aside opportunity involves removing eight existing vault toilet buildings and replacing them with eight new precast, concrete double vault toilet buildings across various campgrounds within the Lassen National Forest, California. The estimated project magnitude is between $500,000 and $1,000,000. Quotes are due by May 1st, 2026, at 1:00 PM Pacific Time.

Scope of Work

The project requires the complete removal and legal disposal of seven double vault and one single vault toilet buildings, including structures, concrete floor slabs, and non-friable asbestos-containing materials. Human waste must be pumped out prior to demolition. New installations will consist of eight ABAS-compliant double vault restrooms (e.g., CXT Cascadian Double Vault, Romtec SST Aspen Double Vault, or approved equivalent) at the same locations. These new units must meet specific performance standards, including high snow/floor/wind loads, seismic design category E, and features like grab bars, solar lighting, and Sweet-Smelling Technology (SST). Pathway improvements connecting new restrooms to roads and parking areas are also required. Site preparation, including clearing, grubbing, excavation, and backfilling to 95% minimum density, is incidental. Work will occur in Ashpan Snowmobile Park, Battle Creek, Hole In The Ground, and Bridge Campgrounds in Tehama and Shasta Counties, California.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (RFQ)
  • Anticipated Award Type: Firm Fixed Price
  • Estimated Magnitude: $500,000 to $1,000,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237990 - Other Heavy and Civil Engineering Construction
  • Small Business Size Standard: $45 Million
  • Period of Performance: 90 calendar days after Notice to Proceed (NTP), commencing within 10 calendar days of NTP.
  • Bonds: Performance and Payment Bonds are required.
  • Wage Determination: Davis-Bacon Act Wage Determination CA20260007 applies.
  • Place of Performance: Lassen National Forest, Mineral, CA 96063.

Submission & Evaluation

  • Requests for Information (RFIs): Due by April 17th, 2026, 1:00 PM Pacific Time, submitted via email to Gregory.Cunningham@usda.gov using the provided RFI Form. No questions accepted after this deadline.
  • Quotes Due: By May 1st, 2026, 1:00 PM Pacific Time, emailed to Gregory.Cunningham@usda.gov.
  • Required Documents: SF1442, Attachment 3 (Schedule of Items), Technical Approach/Past Performance, and Bid Guarantee (if requested).
  • Evaluation Criteria: Award based on the most technically advantageous solution, considering Technical Approach, Past Performance, and Price. Not solely lowest price.
  • Site Visit: No organized site visit; locations are public for viewing.
  • Compliance: Active SAM.gov registration required; prices firm for 60 calendar days.
  • Contract Administration: Invoicing via IPP. Post-award virtual conference within 10 days of award.

Special Requirements

Contractors must adhere to a Fire Plan, manage waste per EPA regulations, and ensure proper handling of hazardous materials. Key personnel designations are required, and the contractor is responsible for providing utilities and site security.

People

Points of Contact

Greg CunninghamPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
127EAW26Q0011 - GAOA, Lassen NF Toilet Replacement | GovScope