1355-01-436-4620-CWFP CABLE ASSY, ADCAP F/MK48 MODS 6 & 7 TORPEDOES
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting proposals for the procurement of CABLE ASSEMBLY, ADCAP F/MK48 MODS 6 & 7 TORPEDOES (NSN: 4T-1355-01-436-4620-CWFP). This is a 100% Total Small Business Set-Aside opportunity. Proposals are due by February 23, 2026.
Scope of Work & Requirements
The primary deliverable is the CABLE ASSEMBLY, ADCAP F/MK48 MODS 6 & 7 TORPEDOES, which supports torpedo systems. The solicitation references various drawings and specifications, including DWG: 6894510 H and 6894520 REV E. Key requirements include First Article Testing (FAT) for items 0001AB and 0001AC, Production Lot Testing for 0001AC, and Technical Data for 0001AA. Item Unique Identification and Valuation (DFARS 252.211-7003) and NIST SP 800-171 DoD Assessment Requirements are applicable.
The Contract Data Requirements List (CDRL), DD Form 1423-1, mandates submissions such as Test Procedures (A001), Test/Inspection Reports (A002), Failure Analysis/Corrective Action Reports (A003), Ammo Data Cards (A004), and a monthly Contractor's Progress, Status and Management Report (A005). Only one progress report (DD Form 375) is required. The estimated cost for First Article Testing is $75,000.00 for both FAT samples.
Key Amendments & Clarifications
Several amendments have been issued, providing crucial clarifications:
- The Aft Cable Keeper Dimension is 1.00 inch, not 1.25 inch.
- An extruded jacket is generally not permissible as an alternate to heat shrink; deviations require a waiver.
- A Source Control Drawing has been added to the Technical Data Package (TDP) for the potting compound (BOM Item 29).
- Drawing Note 4L refers to item 5 on the sub-assembly drawing for item 11 (PN 6894530), and lubricant should not be applied to the preformed packing.
- Laser marking may be permissible if it produces white marking and does not affect the surface; deviations require a waiver.
Contract Details
This is anticipated to be a Firm Fixed-Price contract. The opportunity is a 100% Total Small Business Set-Aside. A quote validity of at least 120 days is required. The award timeline is not guaranteed before the end of 2025 and may extend into 2026.
Submission & Evaluation
Proposals must be submitted electronically via email. The evaluation will prioritize Past Performance (Quality and Timeliness of Delivery), which is significantly more important than Price. Offerors must achieve at least a "limited confidence" rating in Past Performance to be eligible for award. The Government reserves the right to award without discussions.