14--COMPUTER GROUP,GUID, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS), has issued a solicitation for the repair and modification of Computer Group Guidance units. This requirement focuses on returning assets to a Ready For Issue (RFI) condition through comprehensive inspection, component repair, reassembly, and testing. Proposals are due February 23, 2026.
Scope of Work
The contractor shall provide all necessary facilities, labor, materials, and tooling to repair and upgrade the following item:
- Item: Computer Group, Guidance
- NSN: 1430-01-444-2098
- Part Number: 704AS12334
Key technical requirements include:
- Compliance with OEM technical drawings and ISO 9001/SAE AS9100 quality standards.
- Prohibition of MIL-W-81381 wire; SAE-AS22759 series wire must be used as a replacement.
- Management of Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) processes.
- Use of the Commercial Asset Visibility (CAV) system for reporting transactions.
Contract & Timeline
- Type: Solicitation (Repair/Modification)
- Response Due: February 23, 2026
- Repair Turnaround Time (RTAT): 131 days after receipt of asset
- Induction Expiration: 365 days after contract award
- Priority Rating: DO-A7
- Set-Aside: None specified
Evaluation
Evaluation will focus on the contractor's ability to meet the technical specifications, quality requirements, and the established throughput constraints. Early and incremental deliveries are accepted and preferred.
Additional Notes
The government will not provide special tooling or test equipment. Contractors must maintain a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1 standards.