14--MECHANISM ASSEMBLY, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, has issued a Solicitation for the repair and modification of Mechanism Assemblies (NSN 1440-01-461-2195, P/N 3455AS120). This opportunity seeks qualified contractors to restore these critical components to a Ready For Issue (RFI) condition, ensuring operational readiness. Proposals are due by March 13, 2026.
Scope of Work
The contractor will be responsible for the repair, testing, inspection, overhaul, and upgrade of Mechanism Assemblies. This includes providing all necessary facilities, labor, materials, parts, and test/tooling equipment. Work must adhere to the latest approved methods and publications. Key requirements include:
- Repair Turnaround Time (RTAT): 201 days after asset receipt.
- Throughput Constraint: Contractor to specify monthly repair capacity.
- Induction Expiration Date: 365 days after contract award.
- Quality Assurance: Compliance with ISO 9001/SAE AS9100 and ANSI/NCSL Z540.3 calibration standards.
- Configuration Management: Adherence to NAVSUP WSS clause NAVICPIA18.
- Material Requirements: Contractor to supply new parts and materials unless PCO approval is obtained for alternatives. Specific procedures for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) items are detailed.
Contract & Timeline
- Type: Solicitation for repair/modification services. Award will be based on the best value proposal.
- Set-Aside: None specified.
- Proposal Due: March 13, 2026, at 18:00 UTC.
- Published: February 24, 2026.
- Delivery: Early and incremental deliveries are accepted and preferred.
Evaluation
Award will be issued based on the best value proposal.
Additional Notes
Contractual documents are considered "issued" when deposited in mail, transmitted by facsimile, or sent by other electronic commerce methods. The contractor must specify the name and location of the repair source.