14816 Polyalphaolefin (PAO) Chiller Skid System
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting quotes (RFQ FA822-26-14816V2) for a Polyalphaolefin (PAO) Chiller Skid System at Hill Air Force Base, UT. This requirement, reissued under full and open competition, involves the installation of a new PAO chiller, pump, manifolds, distribution piping, controls, and instrumentation to provide cooling for aircraft representative equipment. Quotes are due by Monday, May 11, 2026, at 10:00 AM (MT).
Scope of Work
The project requires the provision and installation of a new PAO chiller system, including a redundant chiller design with two pump skids (A and B), each managing a 200 kW heat load. Six low-profile wall-mounted PAO control centers (manifolds) will be installed in various rooms (B102, B200, A201, A204). The scope also includes hard or rigid stainless-steel piping with Swagelok fittings, provision of Safety Data Sheets for hazardous materials, and engineered/stamped designs. A dedicated, sound-attenuated room will be constructed to house the chillers, and the new system must integrate with existing facility chilled water systems.
Performance Standards
Key performance metrics include PAO fluid delivery at 20 GPM between 120-130 PSI at 59°F (±3°), manifold capability to supply 20 GPM at 130 PSI, and manifold adjustability from 0-130 PSI and 0-20 GPM. The system requires a safety and alarm system for various conditions. A 5-year warranty for PAO piping and a 1-year warranty for mechanical room equipment are required.
Contract Details
- Contract Type: Firm Fixed Price (FFP)
- Set-Aside: Not a set-aside for small business concerns (full and open competition)
- Product Service Code: 4120 (Air Conditioning Equipment)
- Place of Performance: Building 1513, Hill Air Force Base, UT 84056
- Period of Performance: 365 days after contract award
Submission & Evaluation
- Quotes Due: Monday, May 11, 2026, at 10:00 AM (MT)
- Submission Method: Electronic mail to Zcheherah Macapinlac (zcheherah.macapinlac@us.af.mil) and Jonathan Graham (jonathan.graham.11@us.af.mil).
- Required Information: Offerors must provide Cage Code and SAM UEI.
- Evaluation Factors: Price, Past Performance, and Technical Capability of the item offered.
Clarifications & Amendments
Amendment 1 (dated 05.07.2026) provides Questions & Answers (Q&As). Key clarifications include chiller sizing data: assume a chilled water system flow rate of 350 GPM and a chilled water design temperature of 48°F. These parameters are essential for technical proposals. The amendment confirms no changes to proposal deadlines.
Special Requirements
Contractor personnel must be U.S. citizens and adhere to strict security protocols. A full technical documentation package, scheduled maintenance, and "Hotline" support are required. Compliance with various codes and standards (UFC, IBC, NFPA, NEC, ASHRAE, AWWA) is mandatory.