15--TANK,FUEL,AIRCRAFT, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP Weapon Systems Support is seeking quotes for the repair and modification of aircraft fuel tanks, specifically TANK ASSEMBLY,FUEL, P/N HM022-312-11, NSN 1670-014328927. This Request for Quote (RFQ) requires contractors to submit either a firm-fixed price or Time & Material (TT&E) pricing, along with estimated repair costs. Quotes are due by April 7, 2026.
Scope of Work
The contractor will be responsible for the repair, testing, and inspection of the subject items to a Ready For Issue (RFI) condition. This includes component repair, replacement, reassembly, and testing. Key requirements include:
- Providing all necessary facilities, labor, materials, parts, and test/tooling equipment.
- Using SAE-AS22759 series wire in lieu of MIL-W-81381 wire.
- Adhering to procedures for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR).
- Supplying all parts and materials unless specifically identified as Government Furnished Material (GFM).
- Maintaining a quality system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1.
- Maintaining a configuration management plan.
- The specified repair source is ROBERTSON FUEL SYSTEMS LLC at 800 W. CARVER RD. SUITE 101. TEMPE, AZ. 85284.
Contract & Timeline
- Type: Solicitation (RFQ)
- Set-Aside: Not applicable (no set-aside recommendation was made).
- Requested RTAT: 45 days
- Quote Due: April 7, 2026, 6:00 PM ET
- Published: May 4, 2026 (Note: The published date is after the response date, indicating a potential re-posting or amendment with an earlier deadline.)
Additional Notes
The Government's acceptance of the contractor's proposal constitutes a bilateral agreement. Contractors must ensure access to updated drawings and specifications. Part cannibalization is not authorized unless specifically approved.