155mm M795 Metal Parts Artillery Assembly Ceiling Increase Justification and Approval

SOL #: W15QKN-19-D-0084Justification

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-PICA
PICATINNY ARSENAL, NJ, 07806-5000, United States

Place of Performance

Wilkes Barre, PA

NAICS

Ammunition (except Small Arms) Manufacturing (332993)

PSC

Ammunition, Over 125 Mm (1320)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 3, 2025

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The U.S. Army Contracting Command-New Jersey (ACC-NJ) on behalf of the Office of the Project Manager for Combat Ammunition Systems (PM CAS) both located at Picatinny Arsenal, New Jersey awarded a Sole Source, Firm Fixed Price (FFP) modification for the manufacture, test, packaging, and delivery of 155mm M795 Metal Parts Assembly.  

Modification P00022 was awarded under the current contract W15QKN-19-D-0084 with General Dynamics OTS (Wilkes Barre), LLC, 1500 Highway 315 Blvd, Wilkes Barre, PA 18702-7005 to increase the contract ceiling by $15,000,000.00 from $891,165,000.00 to $906,165,000.00.  This modification was issued under the authority of 10 U.S.C.3204(c)(1); as implemented by FAR 6.302-1(a)(2)(ii)(B)-Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements in accordance with the attached Justification and Approval.  This modification is to ensure adequate property management and production support of the Scranton Army Ammunition Plant (SCAAP), a Government Owned, Contractor Operated facility as a result of increased production. Appropriate and available funds are available for this acquisition.

This announcement is for notification purposes only and shall NOT be construed as a formal Request for Proposal (RFP) nor is the Government obligated to issue an RFP. Any information or exchanges between Contractors and the USG are at no cost and/or obligation to the USG. Telephone inquiries will not be accepted.

People

Points of Contact

Christopher BartowPRIMARY
Amy SentnerSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Justification
Posted: Dec 3, 2025
155mm M795 Metal Parts Artillery Assembly Ceiling Increase Justification and Approval | GovScope