16--BLOWER,NACELLE,AIRC, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support, has issued a Solicitation for the repair and modification of BLOWER,NACELLE,AIRC. This requirement seeks contractors to provide comprehensive repair, overhaul, testing, and inspection services for these aircraft components. Quotes are due by August 3, 2026.
Scope of Work
This solicitation covers the repair, overhaul, testing, and inspection of BLOWER,NACELLE,AIRC (NSN: 7RH 1680 016522406 V2, P/N: 32680-10). Key requirements include:
- Repair/Overhaul: Disassembly, cleaning, inspection, repair/replacement of components, reassembly, and testing to return units to a Ready For Issue (RFI) condition.
- Technical Standards: Markings in accordance with MIL-STD-130. Prohibition of MIL-W-81381 wire, with SAE-AS22759 series wire required instead. Compliance with IPC/EIAJ-STD-001C for personnel.
- Contractor Responsibility: Contractors are responsible for providing all necessary facilities, labor, materials, parts, test, and tooling equipment. Government-furnished property will not be provided.
- Quality Assurance: Contractors must establish and maintain a quality system conforming to ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. A Repair Quality Plan compliant with Mil-I-45208A, Mil-Q-9858, ISO 9000/9001/9002 is required.
- Material Control: Strict control over purchased parts and materials, including receiving inspection and adherence to FAR 52.211-5 for new materials. Cannibalization is generally not authorized without specific PCO approval.
- Special Conditions: Procedures are outlined for Beyond Economical Repair (BER), Missing on Induction (MOI) of Shop Replaceable Assemblies (SRAs), and Over and Above Repair (OAR), requiring specific approvals and documentation.
- Packaging: MIL-STD 2073 packaging applies.
Contract & Timeline
- Type: Solicitation (requesting firm-fixed price quotes)
- Set-Aside: No set-aside applicable
- Response Due: August 3, 2026, 6:00 PM ET
- Published: June 16, 2026
Submission & Contact
Contractors are requested to submit quotes, including a firm-fixed price, via email to Linda.vong2.civ@us.navy.mil. For questions, contact Linda Vong at linda.vong2.civ@us.navy.mil or 215-697-3992.