16--CABIN PRESSURE SELE, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS), has issued an amendment for the repair and modification of Cabin Pressure Selectors (P/N 1019439-2-001, NSN 7RH 1680 016838490 P8). This solicitation seeks contractors to provide repair services for these miscellaneous aircraft accessories and components. Quotes are due by June 12, 2026.
Scope of Work
This requirement is for the repair and testing/inspection of Cabin Pressure Selectors. The contractor will be responsible for all necessary labor, materials, parts, and tooling equipment. The scope includes:
- Disassembly, cleaning, inspection, repair, reassembly, and testing to return units to a Ready For Issue (RFI) condition.
- Adherence to HAMILTON SUNDSTRAND drawing number 73030, 1019439-2-001, Revision latest, and all referenced specifications.
- Compliance with MIL-STD-130 for markings.
- Management of Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) items according to specified procedures.
Contract & Timeline
- Type: Solicitation for Repair Services (RFQ for firm-fixed price or TT&E pricing)
- Set-Aside: No set-aside applicable (determined by SBA representative)
- Response Due: June 12, 2026, 8:30 PM EDT
- Published: June 12, 2026
Key Requirements
- Quality System: Contractors must establish and maintain a quality system conforming to ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1.
- Configuration Management: A configuration management plan is required per NAVICPIA18.
- Parts & Materials: Contractor is responsible for supplying all parts and materials, which must be new (per FAR 52.211-5) unless PCO-approved. Cannibalization is generally not authorized without specific PCO approval.
- Facility: Contractors must specify the name and location of the facility performing the work and provide a proper enclosed warehouse environment for storage.
- Clauses: This amendment incorporates new FAR clauses per class deviation 2025-O0003, including updates to 52.204-8, 52.212-3, 52.212-5, 52.213-4, 52.222-9, and 52.244-6, while deleting older 52.222 clauses.
Additional Notes
The Government's acceptance of the contractor's proposal constitutes a bilateral agreement. Contact Gina P. Sassane at gina.p.sassane.civ@us.navy.mil or 215-697-2198 for inquiries.