16--ROD,PISTON

SOL #: N0010424QFF09Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Aircraft Hydraulic, Vacuum And De Icing System Components (1650)

Set Aside

No set aside specified

Timeline

1
Posted
Aug 29, 2024
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Sep 13, 2024, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically NAVSUP Weapon Systems Support Mechanicsburg, is soliciting proposals for the procurement of Piston Rods (Outbd). This is a full and open competition opportunity. The piston rods are designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) due to their critical use in shipboard systems, where failure could lead to serious personnel injury, loss of life, vital systems, or the ship itself. Proposals are due by March 25, 2026.

Scope of Work

The contract requires the supply of piston rods (Outbd) in accordance with NAVORD drawing 3224096. Key material requirements include QQ-N-286, Form 2, Hot Finished and Age Hardened, with specific prohibitions on welding this material. The scope emphasizes stringent quality assurance, including quantitative chemical and mechanical analysis, age hardening, and ultrasonic inspection. Thread inspection must adhere to FED-STD-H28 series, and O-ring grooves/sealing surfaces require inspection per specified criteria or the General Acceptance Criteria (CSD008).

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: Full and Open Competition (Small Business Set-Aside dissolved)
  • Response Due: March 25, 2026, 8:30 PM EDT
  • Published: March 12, 2026

Key Requirements & Quality Assurance

This opportunity demands a robust quality system, requiring compliance with ISO-9001 (or MIL-I-45208) and calibration systems per ISO-10012 or ANSI-Z540.3 with ISO-17025. Contractors must maintain total equipment baseline configuration, with all waivers, deviations, and Engineering Change Proposals (ECPs) requiring Contracting Officer approval. A Certificate of Compliance for Special Emphasis Material is mandatory, along with detailed test certifications (CDRL DI-MISC-80678) and material certifications (CDRL DI-MISC-81020).

Traceability is paramount, requiring unique traceability numbers, heat-lot numbers, or heat-treat numbers marked on the material, directly linking to chemical composition and mechanical properties certification data. Re-certification is required if material properties are altered during processing. Stringent material handling, receiving inspection, and final inspection procedures are outlined, including 100% inspection for traceability markings and certification data. Government Quality Assurance (GQA) at source by DCMA QAR is required, and subcontractors are subject to similar quality controls. Packaging must comply with MIL-STD 2073.

Submission & Contact

Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance via Wide Area Work Flow (WAWF), with specific "Ship to," "Inspect by," and "Accept by" codes (N50286, N39040, N39040 respectively) and email notification to PORT_PTNH_WAWF_Notification@navy.mil. No material is to be shipped prior to acceptance. For questions, contact SCOTT.R.YOUNGBLOOD2.CIV@US.NAVY.MIL or call 717-605-2379.

People

Points of Contact

SCOTT.YOUNGBLOOD@NAVY.MILPRIMARY

Files

Files

View

Versions

Version 9
Solicitation
Posted: Mar 12, 2026
View
Version 8
Solicitation
Posted: Mar 6, 2026
View
Version 7
Pre-Solicitation
Posted: Mar 6, 2026
View
Version 6
Solicitation
Posted: Nov 5, 2025
View
Version 5
Solicitation
Posted: Nov 5, 2025
View
Version 4
Pre-Solicitation
Posted: Nov 5, 2025
View
Version 3
Solicitation
Posted: Sep 23, 2024
View
Version 2Viewing
Solicitation
Posted: Sep 6, 2024
Version 1
Pre-Solicitation
Posted: Aug 29, 2024
View
16--ROD,PISTON | GovScope