20--HUB,PROPELLER,SHIP
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP Weapon Systems Support Mech has issued a solicitation for the procurement of HUB, PROPELLER, SHIP components. This Request for Quotation (RFQ) is issued under Emergency Acquisition Flexibilities (EAF), encouraging accelerated delivery. The resultant award will be a bilateral agreement. Offers are due by March 27, 2026.
Scope of Work
This contract requires the manufacture and supply of HUB, PROPELLER, SHIP components, adhering to specific design representations (Cage Code/Reference Number Items) and marked in accordance with MIL-STD-130. A critical requirement is American Bureau of Shipping (ABS) certification for each item, with original certificates packaged with the delivery and copies submitted to the government.
Contract & Timeline
- Type: Solicitation (RFQ for a buy, bilateral award)
- Set-Aside: No set-aside specified
- Response Due: March 27, 2026, 8:30 PM EST
- Published: February 25, 2026
Key Requirements & Evaluation
Offerors must verify nomenclature, part number, and National Stock Number (NSN) before responding. Government source inspection is required. Unit and Total Prices must be FIRM. A crucial traceability notice mandates that non-manufacturers provide a letter from the OEM confirming authorized distributor status. Evaluation will consider commercial products and services. Contractors are responsible for all inspection requirements and maintaining records for 365 days post-delivery.
Additional Notes
All freight is FOB Origin. Changes in design, material, servicing, or part number must follow specific coding and approval processes. Contractors must submit "ABS/USCG CERTIFICATION" test/inspection reports electronically in PDF format within seven calendar days of ABS Inspector acceptance. Ordering information for various documents (DODSSP, Commercial, NOFORN) is provided.