20--HUB,PROPELLER,SHIP
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is a Solicitation for the procurement of a HUB, PROPELLER, SHIP under a Firm Fixed-Price contract. The opportunity involves the manufacture and supply of specific propeller hubs, requiring adherence to detailed design, quality, and certification standards. The solicitation includes amendments to update quantity, clauses, provisions, and extend the closing date. Proposals are due by February 5, 2026.
Scope of Work
The contract requires the manufacture and supply of the HUB, PROPELLER, SHIP, specifically the design represented by Cage Code 07309, reference number 115752000 R.H. Key requirements include:
- Design & Marking: Adherence to specified Cage Code/reference numbers and physical identification in accordance with MIL-STD-130, REV N.
- Design Changes: Any changes in design, material, servicing, or part number must follow a specific code system and require written approval from the NAVICP-MECH Contracting Officer.
- Certification: Each item must be certified by the American Bureau of Shipping (ABS), with an original ABS certificate packaged with the item and copies submitted electronically to the government. If received from a stockpoint, ABS Certification must be done at the point of installation.
Contract & Timeline
- Type: Firm Fixed-Price (FFP)
- Product Service Code: 2010 (Ship And Boat Propulsion Components)
- Set-Aside: None specified
- Proposal Due: February 5, 2026, by 18:00Z
- Published: January 23, 2026
Quality Assurance & Packaging
The contractor is responsible for performing all inspection requirements, ensuring compliance, and maintaining records for 365 days post-delivery. Nondestructive Test/Inspection Reports (ABS/USCG CERTIFICATION) are required. Packaging shall be in accordance with MIL-STD 2073.
Submission & Additional Notes
- Submission: Emailed proposals are acceptable, but NECO quotes will not be accepted. The complete RFP package must be signed and returned.
- Authorized Distributors: Consideration for award will only be given to authorized distributors of the original manufacturer's item. Proof of authorization on company letterhead, signed by a responsible official, must be submitted with the offer.
- Document References: Information on obtaining applicable documents (DODSSP, commercial, ordnance, NOFORN, etc.) is provided.
- Certification Submission: Copies of the actual ABS certification document must be furnished within seven calendar days after ABS Inspector's acceptance and signature, submitted electronically in PDF format to MSC, Norfolk, VA.