20--SHIP AND MARINE EQUIPMENT (REPAIR ASSEMBLY, BOMB JETTISONING RAMP)

SOL #: N0040619Q0161Pre-Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR PUGET SOUND
BREMERTON, WA, 98314-5100, United States

Place of Performance

Place of performance not available

NAICS

Fabricated Structural Metal Manufacturing (332312)

PSC

Ship And Marine Equipment (20)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 29, 2019
2
Response Deadline
May 10, 2019, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

SOLE SOURCE:

EMAIL QUESTIONS TO: WILFREDO.GERVACIO@NAVY.MIL

This acquisition will be negotiated on a sole source basis with HUNTINGTON INGALLS INC. DIV NEWPORT NEWS, per FAR 6.302-1 utilizing FAR Parts 12 and 13, Commercial and Simplified Acquisition Procedure.

Interested persons may identify their interest and capability to respond to the requirement or submit proposals prior to the offer due date, which will be considered solely for the purpose of determining whether to conduct a competitive procurement. A determination not to compete this action based upon responses received to this notice is solely within the discretion of the Government.

Award of firm-fixed price supply type contract is anticipated.

The required delivery date is 60 DAYS ARO.

It is anticipated that the solicitation will be posted to the NECO website on or about 30 APRIL 2019 with quotes due on or about 10 MAY 2019.

Prospective offerors are responsible for downloading their own copy of the solicitation from the NECO website and for frequently monitoring the site for any amendments. The Government is not responsible for any inability of the offeror to access the posted documents.

Electronic submission of quotes via NECO or to my email.

People

Points of Contact

WILLY GERVACIOPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Apr 29, 2019
20--SHIP AND MARINE EQUIPMENT (REPAIR ASSEMBLY, BOMB JETTISONING RAMP) | GovScope