20TON Split A/C Unit

SOL #: FA301620TONSplitACUnitRANSolicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3016 502 CONS CL
JBSA LACKLAND, TX, 78236-5286, United States

Place of Performance

DWG, TX

NAICS

Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing (333415)

PSC

Air Conditioning Equipment (4120)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Submission Deadline
Apr 24, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for a 20-Ton Split Air Conditioning Unit to replace an existing system at Randolph Air Force Base, Texas. This is a Firm Fixed-Price contract set aside for Total Small Businesses. The requirement includes the procurement and delivery of a new, energy-efficient A/C system, with specific technical specifications for both the outdoor condensing unit and indoor air handler. Quotes are due by 4:00 PM CST on Friday, April 24, 2026.

Scope of Work

This opportunity requires the procurement and delivery of a complete 20-ton split air conditioning system, including all necessary supervision, labor, transportation, materials, tools, incidentals, equipment, and quality assurance. The new system will replace an unsupportable 20-ton system located at BLDG 1048, 10801 W. Fourth St., Randolph AFB, Texas 78234. The system must be energy-efficient, compliant with current environmental regulations, and provide reliable cooling and heating.

Key Requirements & Specifications

The new system must be new and unused, meeting or exceeding US DOE 2023 minimum efficiency standards and AHRI Standard 340/360, and utilize a modern, low Global Warming Potential (GWP) refrigerant such as R-454B. It must operate on a 208/230V, 3-Phase, 60Hz power supply.

Specifics include:

  • Outdoor Condensing Unit: Nominal 20 TON (240,000 BTU/h), 208/230V, 3 Phase, 60HZ, R-454B refrigerant, dual scroll compressors, 3 fans, up to 11.2 EER / 14.8 IEER. Must be designed for minimal structural modifications and have forkable base rails.
  • Indoor Air Handler: Nominal 20 TON (240,000 BTU/h), 5HP motor, 230V, 60HZ, 3 Phase. Must deliver a minimum airflow of 8,000 CFM, include a multi-row DX cooling coil, and a belt-driven fan system.
  • Heating Capability: An integrated or compatible electric heat kit with a capacity of approximately 20 kW is required, specifically a commercial heat element kit for a 20 TON Air Handler, 208/230V, 3 Phase, 60HZ.

Contract Details & Logistics

  • Contract Type: Firm Fixed Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Product Service Code: 4120 - Air Conditioning Equipment.
  • Period of Performance: 4 weeks after Notice to Proceed.
  • Delivery: FOB Destination to 1615th St East, BLDG. 2, Randolph AFB, Texas 78150-2100, US.
  • Warranty: Manufacturer's standard commercial warranty, with a minimum of one (1) year on all parts.
  • Documentation: Submittal of technical data sheets and performance data for government review, and manufacturer's operating and maintenance manuals.

Submission & Evaluation

  • Quote Submission Deadline: 4:00 PM CST Friday, April 24, 2026.
  • Evaluation: Lowest Price Technically Acceptable (LPTA). Technical acceptability will be evaluated based on the Statement of Objectives (SOO), and price will be evaluated for fairness and reasonableness.
  • Payment: Payment requests and receiving reports are to be submitted electronically via Wide Area WorkFlow (WAWF).

Points of Contact

People

Points of Contact

Ernest SuttonPRIMARY
Erika TurnerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Apr 17, 2026
20TON Split A/C Unit | GovScope