$245M Multiple Award Task Order Contracts (MATOC), Sustainment, Restoration, and Modernization (SRM) Requirements, Okinawa, Japan

SOL #: W912HV24R0004Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SN ENDIST JAPAN
APO, AP, 96338-5010, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 27, 2024
2
Last Updated
Sep 18, 2025
3
Submission Deadline
Dec 3, 2024, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

**THIS IS PHASE ONE OF SOLICITATION W912HV24R0004.*** This Two-Step Solicitation is for Indefinite-Delivery/Indefinite-Quantity (IDIQ) contracts to provide a variety of construction work throughout Okinawa, Japan. MATOC program is defined as an IDIQ contract entered into with two (2) or more sources pursuant to the same solicitation. The envisioned MATOC program is a firm-fixed price (FFP), IDIQ contract that provides a Design-Build (D-B) and Design-Bid-Build (DBB) vehicle for the execution of a broad range of Sustainment, Restoration, and Modernization (SRM) construction work to support U.S. Government facilities in Okinawa, Japan. Contractors will be expected to accomplish a wide variety of construction tasks involving multiple engineering/construction disciplines and trades, to include the likelihood of design and/or support of design for SRM projects. During the life of the contract, projects will be identified as task orders and will be competed amongst those successful contractor(s) who receive a basic contract under the MATOC.SRM construction work includes renovation, maintenance, repair, restoration, and alteration of existing facilities, but may also include major repairs and limited new construction within projects. Work may also entail the restoration, sustainment and/or modernization of water lines, sewer lines, roadways, building exteriors, roofing, building interiors, Heating Ventilation and Air Conditioning (HVAC) systems and components, refrigeration systems, fire suppression systems, fuel pipelines, storage systems, distribution and utilization systems (including lightning), power generators and Uninterrupted Power Supplies (UPS), or the abatement and disposal of asbestos, lead-based paint, and petroleum-contaminated material. Definitions: Sustainment. Sustainment means the maintenance and repair activities necessary to keep an inventory of facilities in good working order. Work includes regular roof replacement, refinishing of wall surfaces, repairing and replacement of heating and cooling systems, replacing tile and carpeting, and similar types of work. Restoration. Restoration means the restoration of real property to such a condition that it may be used for its designated purpose. Restoration includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident, or other causes. Modernization. Modernization activities involve the alteration or replacement of facilities solely to implement new or higher standards (including regulatory changes); to accommodate new functions; or to replace building components that typically last more than 50 years (such as foundations and structural elements). Please follow links below to see the Solicitation document and relevant attachments.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 6
Solicitation
Posted: Sep 18, 2025
View
Version 5
Solicitation
Posted: May 22, 2025
View
Version 4
Solicitation
Posted: Nov 22, 2024
View
Version 3
Solicitation
Posted: Nov 6, 2024
View
Version 2
Solicitation
Posted: Sep 27, 2024
View
Version 1Viewing
Solicitation
Posted: Sep 27, 2024
$245M Multiple Award Task Order Contracts (MATOC), Sustainment, Restoration, and Modernization (SRM) Requirements, Okinawa, Japan | GovScope