26-SIMACQ-E50-0001 -Missile Restraint System Control Console
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Sources Sought Only
Drawings are available upon request and approval.
Fabricate a Control Console to include interfaces to perform the following:
o Detect and indicate PIN-to-SOCKET proper alignment (performed by CR Adapter’s Photo Sensors). This can be
accomplished by using green/red LIGHTS for a go/no-go condition, respectively.
o Engage/disengage SOCKETS and PINS (performed by the CR Adapter’s pneumatic actuators). This can be
accomplished by using green/red PUSH-BUTTONS for a go/no-go condition, respectively. The actuators’ limit
switches need to be monitored during extend/retract operations.
Provide support during the onsite installation at Missile-Intermediate Level Maintenance Facility (M-ILMF) to monitor
the following:
o Connection of the Control Console to the facility-provided Electrical Power Receptacle, including connections to
the Power Supply, Photo Sensors, Limit Switches and Pneumatic Actuators’ Solenoid Valves
o Connection of the Pneumatic Actuators to the facility-provided Compressed Air Drop
o Ensure satisfactory performance of the completed Control System after installation