26-SIMACQ-E50-0001 -Missile Restraint System Control Console

SOL #: N6339426Q4005Sources Sought

Overview

Buyer

Dept Of Defense
Dept Of The Navy
COMMANDING OFFICER
PORT HUENEME, CA, 93043-5007, United States

Place of Performance

Port Hueneme CBC Base, CA

NAICS

Relay and Industrial Control Manufacturing (335314)

PSC

Electrical Control Equipment (6110)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 22, 2025
2
Last Updated
Jan 12, 2026
3
Response Deadline
Dec 2, 2025, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Sources Sought Only

Drawings are available upon request and approval.

Fabricate a Control Console to include interfaces to perform the following:

o Detect and indicate PIN-to-SOCKET proper alignment (performed by CR Adapter’s Photo Sensors). This can be
accomplished by using green/red LIGHTS for a go/no-go condition, respectively.
o Engage/disengage SOCKETS and PINS (performed by the CR Adapter’s pneumatic actuators). This can be
accomplished by using green/red PUSH-BUTTONS for a go/no-go condition, respectively. The actuators’ limit
switches need to be monitored during extend/retract operations.

Provide support during the onsite installation at Missile-Intermediate Level Maintenance Facility (M-ILMF) to monitor
the following:

o Connection of the Control Console to the facility-provided Electrical Power Receptacle, including connections to
the Power Supply, Photo Sensors, Limit Switches and Pneumatic Actuators’ Solenoid Valves
o Connection of the Pneumatic Actuators to the facility-provided Compressed Air Drop
o Ensure satisfactory performance of the completed Control System after installation

 

People

Points of Contact

Files

Files

Download
Download

Versions

Version 3
Solicitation
Posted: Jan 12, 2026
View
Version 2
Solicitation
Posted: Dec 29, 2025
View
Version 1Viewing
Sources Sought
Posted: Nov 22, 2025