29--STARTER,ENGINE,ELEC, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, is soliciting proposals for the repair and modification of 60 "STARTER,ENGINE,ELEC" units (NSN: 7RH 2925 014183193). This opportunity requires Government Source Approval and adherence to strict quality and repair standards. Proposals are due by March 12, 2026.
Scope of Work
This Request for Proposal/Quote (RFP/Q) covers the repair of 60 starter, engine, electric units. Key aspects include:
- Repair Turnaround Time (RTAT): 60 days after receipt of asset.
- Quality Requirements: Contractors must maintain a quality control system meeting Mil-I-45208A, Mil-Q-9858, ISO-9000/9001/9002, or equivalent, and establish a quality system compliant with ISO 9001/SAE AS9100.
- Material Specifications: Prohibits MIL-W-81381 wire, requiring SAE-AS22759 series wire instead. Contractor is responsible for supplying all necessary parts and materials, which must be new unless specifically approved by the PCO.
- Source Approval: Offerors not currently an approved source must submit detailed information for Government Source Approval with their proposal.
- Repair Procedures: Detailed procedures are outlined for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) scenarios, requiring specific approvals and documentation.
- Configuration Management: The contractor must maintain a configuration management plan in accordance with NAVSUP WSS provisions.
Contract & Timeline
- Type: Request for Proposal/Quote (RFP/Q) for repair services. Firm Fixed Price (FFP) is preferred, but offerors should inform the PCO if FFP cannot be determined.
- Set-Aside: None specified.
- Product Service Code: 2925 (Engine Electrical System Components, Aircraft Prime Moving).
- Response Due: March 12, 2026, 6:00 PM EST.
- Published: February 10, 2026.
Additional Notes
Early and incremental deliveries are accepted and preferred. All contractual documents are considered "issued" upon deposit in mail, facsimile, or electronic commerce methods. The contractor must specify the name and location of the facility performing the work.