36C25526Q0102 CAT6a Cable Pull - KC VAMC

SOL #: 36C25526Q0102 Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
255-NETWORK CONTRACT OFFICE 15 (36C255)
LEAVENWORTH, KS, 66048, United States

Place of Performance

Kansas City, MO

NAICS

Wired Telecommunications Carriers (517111)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 17, 2025
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Jan 20, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contract Office 15, is soliciting proposals for a CAT6a Cable Pull project at the Kansas City VA Medical Center, MO. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside for the installation of approximately 800 Cat6a Ethernet cables over a five-year period. Proposals are due January 20, 2026, at 11:00 AM Central.

Scope of Work

This solicitation (36C25526Q0102) requires the installation of approximately 800 Cat6a Ethernet cables over five years, specifically for medical equipment or clinical system installations. The project includes:

  • Installation of 250 cables in the base year and 125 in each of the four option years, including terminations, testing, and certification.
  • Strict adherence to current industry standards, best practices for hospital environments, and infection control measures (PCRAs/ICRAs).
  • Performance of fire-stopping, core drilling, and installation of Hilti Sleeve 4 inch for all pass-throughs.
  • Installation of firestop Speed Sleeves with at least 50% future expansion.
  • Demolition of existing cables for 50% of pulls and new installations (raceway, penetrations, fire protection) for 10% of pulls.
  • Use of preexisting trays or J hooks for raceway.
  • Cable coloring: orange for patient monitoring, blue for all other drops.
  • Deliverables include monthly progress reports, an annual summary report, and a final project report.

Contract Details

  • Contract Type: Firm-Fixed-Price.
  • Period of Performance: Base period plus four option periods, totaling approximately five years.
  • Payment Structure: 12 monthly payments per 50-unit block of work completed, where a 50-unit block is defined as 50 individual runs on a standardized pull list.
  • Estimated Value: Not explicitly stated.

Submission & Evaluation

  • Proposal Due Date: January 20, 2026, at 11:00 AM Central.
  • Question Period Ends: January 14, 2026, at 11:00 AM CT. All questions must be submitted via email to teresa.cabanting@va.gov; telephonic questions will not be accepted.
  • Site Visit: A site visit is scheduled for January 6, 2026, at 9:00 AM Central at the Kansas City VAMC Freedom Pavilion. Offerors are urged to inspect the site.
  • Evaluation Criteria: Technical Capabilities, Past Performance, and Price.
  • Submission Instructions: Offers must be submitted as PDF documents, without colorful logos or special pages, using a 12pt Times New Roman font. Required attachments include a signed SF 1449, completed Contractor's portion of the Contract Administration Data page, acknowledgment of amendments, completed VAAR Clause 852.219-75 Certification, completed FAR Clause 52.212-3 representations and certifications, Attachment 2-FACTOR 1 (Technical Capability), and Attachment 3-FACTOR 3 (Price). Pricing must be in Section B.3.

Key Clarifications (from Amendment 0002)

  • Contractor-furnished materials include HEPA carts and containment.
  • Government will provide data racks and patch panels; new patch panels are not required.
  • PCRA/ICRA approval timeline is 6 working days.
  • Minimal storage space is available on site.
  • Drawings will be provided upon request to the awardee.
  • Vendor may be required to work off-hours and weekends.
  • New construction areas may require the vendor to install conduits and boxes per building code.

Contact Information

People

Points of Contact

Teresa CabantingPRIMARY

Files

Files

Download
Download

Versions

Version 5
Solicitation
Posted: Mar 6, 2026
View
Version 4
Solicitation
Posted: Jan 15, 2026
View
Version 3Viewing
Solicitation
Posted: Dec 18, 2025
Version 2
Solicitation
Posted: Dec 17, 2025
View
Version 1
Solicitation
Posted: Dec 17, 2025
View