36C25626R0044_PRESOL_DESIGN-BUILD REPLACE STEAM AND CONDENSATE LINES

SOL #: 36C25626R0044_PRESOLPre-Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
256-NETWORK CONTRACT OFFICE 16 (36C256)
RIDGELAND, MS, 39157, United States

Place of Performance

AR

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Hospital Buildings (Y1DZ)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Mar 23, 2026
2
Response Deadline
Apr 6, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the Veterans’ Health Care System of the Ozarks (VHSO) in Fayetteville, AR, has issued a presolicitation for a Design-Build Firm-Fixed Price construction contract to replace campus steam and condensate lines (Project 564-26-103). This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The project magnitude is estimated between $10,000,000 and $20,000,000. The solicitation (RFP) is anticipated to be released on or about April 7, 2026.

Purpose & Scope

This opportunity requires a Design-Build contractor to furnish all labor, materials, tools, equipment, expertise, administration, transportation, and supervision necessary to replace all underground steam and condensate distribution lines to and from Buildings 10, 1, 3, 4, and 21 on the Fayetteville campus. The existing, operational steam distribution system must remain functional throughout construction. The project also includes the demolition of all abandoned steam and condensate distribution lines, associated fittings, structures, and unneeded equipment, as well as the modification or replacement of underground structures as necessary.

Key Requirements

  • Design-Build Services: Provide all Architect and Engineering (DB AE) services, materials, supplies, equipment, investigations, project supervision, and construction period services.
  • Design Standards: Design must meet VA Design Guides, Design Criteria, VA Master Specifications (from www.cfm.va.gov/TIL), VA physical security design guide requirements, and all current applicable codes (e.g., IBC, NFPA, OSHA).
  • Construction: Furnish all necessary resources for complete construction, including site development (sidewalks, pathways, curb cuts, ramps, asphalt, landscaping) and site utilities (relocation/temporary connections for steam/condensate, sewer, electrical, communication, storm water, and water).
  • Utility Management: Coordinate all utility shutdowns with the COR, performing them outside regular business hours or on weekends at no additional cost.
  • Phasing: Implement a phased plan to maintain existing system functionality and two-directional campus traffic flow.
  • Commissioning: Provide and cover fees for third-party commissioning of the new system.
  • Quality Control: Develop and execute a rigorous QA/QC plan for the design process.

Contract Details

  • Contract Type: Firm-Fixed Price Construction, Design-Build.
  • Period of Performance: 765 calendar days from the Notice to Proceed.
  • Estimated Magnitude: $10,000,000.00 to $20,000,000.00.
  • Proposal Acceptance Period: 120 days.
  • Bonds: A bid bond is required with the proposal; Performance and Payment bonds will be required from the awardee.

Eligibility & Submission

  • Set-Aside: This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. At least 15% of personnel costs must be spent on employees of the prime or other eligible SDVOSB concerns.
  • NAICS Code: 236220 (Construction of Other Hospital Buildings) with a small business size standard of $45 million.
  • Registrations: Offerors must be registered with SBA VetCert (Veteran Small Business Certification) and SAM.gov, and have completed online Representations and Certifications. The assigned NAICS code must be registered in VetCert.
  • Solicitation Release: Solicitation documents (RFP, specifications, drawings) will be available electronically on or about April 7, 2026. Hard copies will not be mailed.

Important Notes

This is a Pre-Solicitation Notice. Questions will only be accepted after the solicitation has been published. Interested parties are strongly encouraged to register to receive notifications of actions and amendments. Offerors are responsible for frequently checking the site for updates.

People

Points of Contact

Madeline AllisonPRIMARY

Files

Files

Download
Download

Versions

Version 1Viewing
Pre-Solicitation
Posted: Mar 23, 2026
36C25626R0044_PRESOL_DESIGN-BUILD REPLACE STEAM AND CONDENSATE LINES | GovScope