42--GAGE,PRESSURE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP Weapon Systems Support Mechanicsburg is soliciting for the procurement of Pressure Gauges (Weksler Instruments drawing G27-351, part number EA23-3PHP-LWAX). These gauges are designated as SPECIAL EMPHASIS material for crucial shipboard systems, where failure could lead to serious injury, loss of life, or loss of the ship. This solicitation outlines stringent quality assurance, manufacturing, and certification requirements. Proposals are due March 27, 2026.
Scope of Work
The contractor will manufacture and deliver specific pressure gauges, ensuring compliance with detailed specifications including oxygen cleaning (MIL-STD-1330), mercury-free requirements, and configuration control. The material must satisfy toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Welding and brazing, if required, must adhere to S9074-AR-GIB-010A/278 and S9074-AQ-GIB-010/248, with procedures and qualification data submitted for approval.
Contract & Timeline
- Type: Solicitation
- Delivery: Final material delivery within 390 days. Certification data CDRLs 20 days prior to delivery.
- Set-Aside: None specified
- Response Due: March 27, 2026, 8:30 PM EST
- Published: March 24, 2026
Key Requirements
Contractors must maintain a quality system compliant with ISO-9001 (or MIL-I-45208 as an alternate) and calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025 (or MIL-STD-45662 as an alternate). Government Quality Assurance at the source is required. Traceability from material to Objective Quality Evidence (OQE) must be maintained per MIL-STD-792. A Certificate of Compliance is mandatory for all Special Emphasis Material. Waivers, deviations, and Engineering Change Proposals (ECPs) must be submitted via the Electronic Contractor Data Submission (ECDS) system. Packaging must comply with MIL-STD 2073.
Submission Details
Certification data, including test reports, must be submitted to Portsmouth Naval Shipyard via Wide Area Work Flow (WAWF), with specific "Ship to," "Inspect by," and "Accept by" codes (N50286, N39040, N39040 respectively) and email notification to PORT_PTNH_WAWF_Notification@navy.mil. No material is to be shipped prior to acceptance. Cleaning procedures (CDRL DI-NDTI-80603A) are due within 60 days of award, and welding/brazing procedures and qualification data (CDRLs DI-MISC-80875/80876) are due within 120 days of award.
Contact Information
For inquiries, contact NOELLE.M.SMITH10.CIV@US.NAVY.MIL or 717-605-3992.