43--PULLEY ASSEMBLY,IDL, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is seeking proposals for the repair and modification of PULLEY ASSEMBLY,IDL. This solicitation, identified as N0010425QYL030001, has been amended to update the quantity to 31 units and extend the closing date. The requirement is pursuant to Emergency Acquisition Flexibilities (EAF). Proposals are due by June 30, 2026.
Scope of Work
This opportunity covers the repair and quality requirements for the PULLEY ASSEMBLY,IDL. Key aspects include:
- Repair work must meet operational and functional requirements for Cage Code/Ref. No. 6K044 A-D06875-0002.
- Repairs must adhere to contractor's standard practices, manuals, and directives, including MIL-STD-130 for marking.
- Strict mercury-free requirements apply, as the material is for submarine/surface ship use.
- Contractor is responsible for all inspection and testing, maintaining records for 365 days.
- Packaging must comply with MIL-STD 2073.
Contract & Timeline
- Type: Solicitation (resulting contract will be under Basic Ordering Agreement #N0010420GNN01)
- Set-Aside: None specified
- Quantity: 31 units
- Response Due: June 30, 2026, 8:30 PM UTC
- Published: June 9, 2026
Submission Requirements & Evaluation
Offerors must provide:
- Estimated (EST) repair price for the full repair effort.
- Cost of new (actual or estimated) for evaluation.
- A Firm-Fixed Price (FFP) quote for full repair within 90 days of carcass receipt, following a teardown & evaluation (TD&E).
- Details on Teardown & Evaluation Rate, Repair Turn Around Time (RTAT - requested 180 days), Throughput Constraint, and Induction Expiration Date.
- If not the Original End Manufacturer (OEM), provide OEM name, CAGE, and a signed letter of authorization.
- Specify any exceptions in the quote.
- Price reductions will apply for not meeting the required RTAT.
Additional Notes
The resultant award will be issued bilaterally. Contractual documents are considered issued upon deposit in mail, fax, or electronic transmission.