44--Thrust Bearing Oil Coolers Replacement

SOL #: 140R2026Q0005Award Notice

Overview

Buyer

Interior
Bureau Of Reclamation
MP-REGIONAL OFFICE
SACRAMENTO, CA, 95825, United States

Place of Performance

Place of performance not available

NAICS

Power Boiler and Heat Exchanger Manufacturing (332410)

PSC

Heat Exchangers And Steam Condensers (4420)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 2, 2025
2
Last Updated
Feb 18, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation is soliciting quotes for the replacement of ten (10) Thrust Bearing Oil Coolers for the Spring Creek Power Plant Hydro-Electric Generator. This requirement is a Total Small Business Set-Aside (NAICS 332410). The new coolers must be modern, drop-in units designed to meet or exceed the operating characteristics of the original equipment. Quotes are due by January 16, 2026, at 2:00 PM PST.

Scope of Work

The contractor will provide ten (10) modern replacement thrust bearing oil coolers. These units must be drop-in replacements, matching the original cooler dimensions and flange orientations. They must be designed for immersion in ISO 68 turbine oil and freshwater, incorporating an extruded aluminum fin-tube design. Key material specifications include C70600 (90/10 Copper-Nickel) for cooler tubes and 3/4" NPS Cu/Ni 90/10 for flange connections. Manufacturing must comply with ASME BPVC Section VIII (Division 1) and TEMA Class C, requiring an ASME Code "U" stamp. Testing includes hydrostatic testing at 1.5 times maximum allowable working pressure and non-destructive testing of soldered/brazed connections.

Qualifications & Deliverables

Bidders must propose a designer who is a Licensed/Registered Professional Engineer experienced in heat exchanger design. The manufacturer must have at least three years of documented experience and be certified in ASME BPVC Section VIII fabrication processes. Deliverables include preliminary design drawings (45 days post-award), Installation and Operating Guidelines, Test Reports, Quality Control Documentation, and As-built drawings.

Contract & Timeline

  • Contract Type: Firm-Fixed Price Purchase Order
  • Set-Aside: Total Small Business (NAICS: 332410, Size Standard: 750 employees)
  • Quote Due: January 16, 2026, 2:00 PM Pacific Standard Time (PST)
  • Delivery: First four coolers 14 weeks after design approval; remaining six 8 weeks after form/fit verification of the first four.
  • Shipping: All shipping costs must be included in the pricing.

Submission & Evaluation

Quotes must be submitted via electronic mail to mphan@usbr.gov. Required documents include completed pages 2 and 3 (Pricing Schedule), completed FAR Clause 52.212-3, and resumes for the design and reviewing engineers. Offerors must acknowledge Amendment 0001 by submitting a signed SF-30. Award will be made to the responsible vendor whose quote is most advantageous, based on Technical Requirements, Relevant Experience, Past Performance, and Proposed Best Price.

Key Documents

  • Statement of Work (SOW): Details technical requirements, performance standards, and delivery.
  • Technical Drawings: Attachments 1 & 2 (416-214-5513 and 416-214-5514) provide critical layout and detailed engineering specifications for the turbine oil coolers.
  • Combined Synopsis/Solicitation: Outlines submission requirements and evaluation criteria.
  • Amendment 0001: Extends the quote due date.

People

Points of Contact

Phan, MouangPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Award Notice
Posted: Feb 18, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Dec 19, 2025
View
Version 2
Combined Synopsis/Solicitation
Posted: Dec 18, 2025
View
Version 1
Sources Sought
Posted: Dec 2, 2025
View
44--Thrust Bearing Oil Coolers Replacement | GovScope