PD- DOMESTIC WATER TREATMENT SYSTEM

SOL #: 140R3026Q0044Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
LOWER COLORADO REGIONAL OFFICE
BOULDER CITY, NV, 89005, United States

Place of Performance

Parker Dam, CA

NAICS

Commercial and Service Industry Machinery Manufacturing (333310)

PSC

Water Purification Equipment (4610)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 9, 2026
2
Last Updated
Apr 22, 2026
3
Submission Deadline
May 27, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Reclamation, Lower Colorado Region, is soliciting quotes for the direct replacement of a Domestic Water Treatment System at Parker Dam, CA. This Total Small Business Set-Aside opportunity seeks a 360 GPD system to produce potable water meeting California standards. Award will be a fixed-price purchase order based on Lowest-Priced Technically Acceptable (LPTA). Quotes are due May 27, 2026.

Scope of Work

The requirement is for a complete, fully functioning Domestic Pressurized Water Treatment System. Key deliverables include:

  • Supply of new manufactured parts, materials, and equipment, including steel filter vessels, bronze backwash valves, various manifolds, motor-operated butterfly valves, garnet media, and an Aquatic Intelligence Control System Plus with a turbidimeter panel (Hach TU5300sc).
  • A Siemens Sitran Ultrasonic level probe and a pre-fabricated, insulated control enclosure with an AC unit.
  • The system must be capable of producing 360,000 GPD with redundant dual-stage filter banks, each with 250 GPM output capacity, meeting California Surface Water Treatment Rule and Division of Drinking Water (DDW) standards.
  • Services include twelve hours of construction supervision, initial system inspection, commissioning, and eight hours of operator training.
  • Specific warranty periods are required: 1 year for electronics, 3 years for tanks, and 2 years for backwash valves, in addition to standard manufacturer's warranties.

Contract Details

  • Contract Type: Firm-Fixed-Price Purchase Order
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 333310 Commercial & Service Industry Machinery Manufacturing (Size Standard: 1,000 employees)
  • Product Service Code: 4610 Water Purification Equipment
  • Period of Performance: Estimated July 1, 2026, to September 30, 2026.
  • Place of Performance/Delivery: Parker Dam Field Division, Parker Dam, CA 92267. Delivery is FOB Destination.

Submission & Evaluation

Offerors must submit a complete Standard Form (SF) 1449, including pricing, along with their Unique Entity Identifier (UEI) and Contractor E-mail Address. Technical documentation demonstrating that the quoted product meets or exceeds all Statement of Work (SOW) specifications is required, as is a confirmation statement that the firm-fixed price includes F.O.B. Destination shipping. Evaluation will be based on the Lowest-Priced Technically Acceptable (LPTA) methodology, with technical evaluation commencing with the lowest-priced offeror. Prospective contractors must be registered in SAM.gov.

Key Dates & Contact

  • Questions Due: May 12, 2026, 4:00 PM Mountain Time
  • Offers Due: May 27, 2026, 10:00 AM Mountain Time
  • Submission Method: Via email to Bryan Williamson, Contract Specialist, at bwilliamson@ios.doi.gov.
  • Point of Contact: Bryan Williamson (bwilliamson@ios.doi.gov, 702-293-8452).

Attachments

Supporting documents include a detailed Statement of Work (SOW), Attachment 02 - Photos illustrating existing conditions, and Attachment 03 - Drawing providing a detailed flow diagram and valve sequence chart.

People

Points of Contact

Toledo, VirginiaPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Apr 22, 2026
Version 1
Sources Sought
Posted: Mar 9, 2026
View
PD- DOMESTIC WATER TREATMENT SYSTEM | GovScope