48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, has issued a Solicitation for the overhaul of VALVE, REGULATING, FL (NSN 7RE 4810 013539209, P/N 2770073-114). This requirement, initially described as a repair, has been explicitly clarified as an overhaul in accordance with Technical Manual A1-555AC-410-020 and a Statement of Work dated October 29, 2020. The overhaul work will be performed at the contractor's facility, with RUAG AUSTRALIA PTY LTD listed as an example source. Proposals are due by January 30, 2026.
Scope of Work
This requirement involves the overhaul, testing, and inspection of the specified regulating valve to return units to a Ready For Issue (RFI) condition. The contractor is responsible for providing all necessary facilities, labor, materials, parts, and test/tooling equipment. Key aspects include:
- Compliance with OEM technical publications and the provided Statement of Work.
- Prohibition of MIL-W-81381 wire; SAE-AS22759 series wire must be used.
- Adherence to ISO 9001/SAE AS9100 quality system and ANSI/NCSL Z540.3 calibration system.
- Management of Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) items, requiring specific government approvals.
- Use of new parts and materials per FAR 52.211-5, with cannibalization requiring PCO approval.
Contract & Timeline
- Type: Solicitation (Commercial Item Procurement)
- Set-Aside: None specified
- Response Due: January 30, 2026, 6:00 PM Z
- Published: January 28, 2026, 7:38 PM Z (Latest Amendment)
- Place of Performance: Contractor's facility (e.g., RUAG AUSTRALIA PTY LTD, 836 MOUNTAIN HWY Bayswater, VIC, 3153, Australia).
Evaluation & Requirements
Offerors must pass First Article Testing (FAT), which will be performed at the contractor's facility. A waiver can be submitted if FAT was recently passed. Proposals must include a Subcontracting Plan, and the Statement of Work (SOW) and DD Form 1423 will be submitted with the proposal. The required Overhaul Turnaround Time (RTAT) is 34 days after asset receipt, with price reductions for non-compliance. Early and incremental deliveries are accepted and preferred.
Additional Notes
This solicitation has been amended to update clauses, increase quantities, extend the solicitation, and revise shipping instructions for "A" condition assets to SW3218 (RIC CSDX). All contractual documents will be issued electronically. A Request for Variance (RFV) is required for any deviation or waiver.