523-25-003 Bulk Oxygen Corrections

SOL #: 36C24126Q0398Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
241-NETWORK CONTRACT OFFICE 01 (36C241)
TOGUS, ME, 04330, United States

Place of Performance

West Roxbury, MA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Hospitals And Infirmaries (Z2DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
May 7, 2026
2
Last Updated
Jun 16, 2026
3
Submission Deadline
Jun 17, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contract Office 01, has issued a Solicitation for Project 523-25-003, Bulk Oxygen Corrections, at three VA Medical Centers (VAMCs) in Massachusetts: Brockton, Jamaica Plain, and West Roxbury. This project involves correcting NFPA deficiencies in existing Bulk O2 storage tanks. This opportunity is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due June 17, 2026, by 4:00 PM EST.

Scope of Work

The selected contractor shall provide all labor, selective demolition, equipment, material, supervision, and disposal necessary to correct NFPA deficiencies of the existing Bulk O2 storage tanks. Work will be performed in accordance with detailed contract documents, including construction drawings and specifications for each VAMC location. Key areas of work include civil, structural, plumbing (especially oxygen piping routes and connections), and electrical modifications, with strict adherence to NFPA codes and VA design guides.

Contract & Timeline

  • Contract Type: Solicitation (Task Order under VISN 1 Construction MATOC)
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • Magnitude of Construction: Estimated between $1,000,000 and $5,000,000
  • Period of Performance: 275 calendar days from the issuance of the Notice to Proceed (NTP), including time for submittal approvals.
  • Proposal Due Date: June 17, 2026, 4:00 PM EST
  • Request for Information (RFI) Due Date: June 1, 2026, 4:00 PM EDT
  • Published Date: May 18, 2026 (Amendment 0001)

Key Requirements & Notes

  • Submission: Proposals must be submitted electronically via email to Sean.Genereux@va.gov, NCO1ConstructionTeam2Proposals@va.gov, and Heather.Libiszewski-Gallien@va.gov.
  • Site Visits: Site visits were conducted on May 12, 2026 (Jamaica Plain & West Roxbury) and May 15, 2026 (Brockton). Sign-in sheets are available.
  • Safety & Compliance: Strict adherence to OSHA, NFPA, VHA Pre-Construction Risk Assessment (PCRA), and Infection Control Risk Assessment (ICRA) protocols is mandatory. Contractors must provide safety plans, coordinate utility interruptions with three weeks' notice, and ensure a dedicated Site Superintendent is present.
  • Submittals: A preliminary schedule and submittal register are required within 10 days of NTP, with all submittals requiring VA and A/E approval before construction.
  • Bonds: Bid guarantees (20% of bid price or $3M, whichever is less) and Performance/Payment Bonds (for awards >$150,000) are required.
  • Wage Determinations: Relevant wage determinations for Plymouth County (Brockton) and Middlesex/Suffolk Counties (West Roxbury/Jamaica Plain) are provided.

Contact Information

People

Points of Contact

Sean GenereuxPRIMARY
Heather Libiszewski-GallienSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: Jun 16, 2026
View
Version 2Viewing
Solicitation
Posted: May 18, 2026
Version 1
Solicitation
Posted: May 7, 2026
View