554-21-700P2 |Design Build| EHRM Infrastructure Upgrades (Additional FCU's)-Aurora- CO
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
PROJECT DESCRIPTION: The purpose of this project is to Upgrade HVAC in 5 Telcom rooms per VA EHRM standards. Work includes all aspects of design and installation including, but not limited to ducted FCU or In-room unit sizing, selection, location and installation, connection to existing chilled water, electrical, building automation and other systems, relocation or rerouting of other building systems as necessary, firestopping or other similar work, etc.Work is located on different floors of an outpatient clinic building on a hospital campus.Work will need to comply with Infection Control Risk Assessment (ICRA) and disruptive work or utility shutdowns may need to be conducted after-hours.