58--RECEIVER-TRANSMITTE, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, has issued a Solicitation for the repair and modification of RECEIVER-TRANSMITTE units (P/N 902449-801, NSN 014833248). This opportunity requires comprehensive services to return units to a serviceable, Ready For Issue (RFI) condition. Proposals are due by February 9, 2026.
Scope of Work
The contractor will be responsible for the repair, testing, inspection, overhaul, and upgrade of RECEIVER-TRANSMITTE units. This includes providing all necessary facilities, labor, materials, parts, and specialized equipment. Key requirements include:
- Adherence to MIL-STD-130 markings and use of SAE-AS22759 wire.
- Establishing and maintaining a quality system compliant with ISO 9001/SAE AS9100, ANSI/NCSL Z540.3, and other specified military standards (e.g., Mil-I-45208A, Mil-Q-9858).
- Procedures for handling Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) items.
- Defining a Repair Turnaround Time (RTAT) and throughput constraint for each National Stock Number (NSN).
- Providing quality control documentation, test, and repair procedures for Government review and approval.
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified
- Response Due: February 9, 2026, 6:00 PM EST
- Published: January 9, 2026
- Induction Expiration: 365 days after contract award.
- Deliveries: Early and incremental deliveries are accepted.
Additional Notes
The contractor must specify the name and location of the facility performing the repair work. All parts and materials must be new, unless otherwise approved by the Procuring Contracting Officer (PCO). Cannibalization requires specific PCO approval.