59--ADAPTER,CONNECTOR

SOL #: N0010426RFC78Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Current-Carrying Wiring Device Manufacturing (335931)

PSC

Connectors, Electrical (5935)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
Jun 16, 2026
3
Submission Deadline
Jul 15, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is soliciting proposals for the manufacture and delivery of ADAPTER,CONNECTOR components, specifically a Complete Connector Assembly. This material is designated as "SPECIAL EMPHASIS material" due to its critical role in shipboard systems. This opportunity is a Total Small Business Set-Aside. Proposals are due by July 15, 2026.

Scope of Work

The contractor will be responsible for producing a Complete Connector Assembly in accordance with Naval Ordnance Systems Command Drawing LD162875 and Military Specification MIL-C-82620, incorporating revisions from ECP 82.357. The material's critical nature necessitates stringent control procedures to prevent failure, injury, or loss of vital shipboard systems. Key requirements include:

  • First Article Approval (Government Testing): Delivery of four destructive test units to Portsmouth Naval Shipyard.
  • Material Specifications: Adherence to QQ-N-286 for specific parts, with detailed chemical and mechanical analysis.
  • Testing & Certification: Mandatory certifications for Non-Destructive Tests, Acceptance Tests, Ultrasonic Inspection, and Dye Penetrant Inspection.
  • Quality System: Maintenance of a quality system compliant with ISO-9001 (or MIL-I-45208) and calibration system requirements of ISO-10012 (or MIL-STD-45662).
  • Traceability: Strict material traceability and certification requirements for all Level I/SUBSAFE materials, including electronic signatures on certification documents.
  • Welding/Brazing: Procedures and qualification data must be submitted for review and approval prior to performing any welding or brazing. Repair welding is not permitted on QQ-N-286 material.
  • Mercury-Free: All hardware and supplies must be mercury-free.

Contract & Timeline

  • Type: Solicitation (expected Firm Fixed-Price).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Proposal Due: July 15, 2026, at 6:00 PM ET.
  • Published: May 22, 2026.
  • Delivery Schedule: Certification Data CDRLs are due 20 days prior to scheduled delivery, with final material delivery 365 days after the contract's effective date.
  • Rating: This will be a "DO" rated order under the Defense Priorities and Allocations System (DPAS).

Submission & Quality Assurance

Proposals must be signed and returned by the closing date; emailed or faxed proposals are acceptable, but NECO quotes will not be accepted. Access to drawings requires a request on SAM.gov and an email to the Primary POC. The contractor must use the Workflow Pro (WFP) MOD Assist Module. Government Quality Assurance (DCMA QAR) will be performed at the source, and the Electronic Contractor Data Submission (ECDS) system is available for data submissions and inquiries.

People

Points of Contact

BENJAMIN.SPANGLER@NAVY.MILPRIMARY

Files

Files

View
View

Versions

Version 6
Solicitation
Posted: Jun 16, 2026
View
Version 5
Pre-Solicitation
Posted: Jun 16, 2026
View
Version 4
Solicitation
Posted: May 28, 2026
View
Version 3Viewing
Solicitation
Posted: May 22, 2026
Version 2
Solicitation
Posted: May 18, 2026
View
Version 1
Pre-Solicitation
Posted: May 4, 2026
View