59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support Mechanicsburg, has issued a Solicitation for the repair and modification of Circuit Card Assemblies. This requirement seeks a Firm-Fixed-Price solution to maintain critical electronic components. Proposals are due by March 31, 2026. There is no set-aside specified for this opportunity.
Scope of Work
This contract covers the repair and modification of CIRCUIT CARD ASSEMB (CAGE 00724, Reference Number 7017826-005). All repair work must meet the operational and functional requirements of the specified items and be performed in accordance with the contractor's standard practices, manuals, and directives. Items must be marked in accordance with MIL-STD-130, REV N. Changes in design, material, or part number require prior approval from the Procurement Contracting Officer.
Contract & Timeline
- Type: Firm-Fixed-Price (FFP) for repair services.
- Option: Includes a 55% option for increased quantity, exercisable within 179 days after award. Offerors must submit pricing for this option.
- Set-Aside: None specified.
- Response Due: March 31, 2026, by 20:30:00Z.
- Published: December 31, 2025.
Evaluation
Award will be based upon the lowest aggregate total price submitted for the total quantity, inclusive of the option provision. Offerors must provide repair price as firm-fixed-price, along with teardown & evaluation rate, Return Turnaround Time (RTAT), throughput constraint, and induction expiration date. Price reductions of 1% per asset per month will apply if required RTATs are not met.
Additional Notes
Contractors are responsible for all inspection requirements, with DCMA source inspection and acceptance required. The Government will use its implemented shipping system (NAVSUPWSSFA24); therefore, shipping costs should not be included in proposals. Only authorized distributors of the Original Equipment Manufacturer (OEM) for the solicited item will be considered, and proof of authorization is required. Compliance with FAR clauses 52.204-24, 52.204-25 and DFARS clauses 252.204-7008, 252.204-7012, 217.7301 is mandatory. Contractors are encouraged to register for the Electronic Document Access (EDA) web tool via WAWF. All questions should be directed to Leo Dougherty at LEO.DOUGHERTY@NAVY.MIL.