59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is soliciting proposals for the repair and modification of Circuit Card Assemblies. This is a Firm Fixed-Price (FFP) opportunity, requiring contractors to be an authorized repair source. The response deadline has been extended to February 25, 2026.
Scope of Work
This solicitation covers the repair and quality requirements for CIRCUIT CARD ASSEMB (CAGE/Ref. No. 1U7M4 7017692-004; 00724 7017692-004). Repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings, technical orders, and approved repair standards. Key requirements include:
- Marking: In accordance with MIL-STD-130, REV N.
- Electrostatic Discharge Control: Compliance with MIL-STD-1686.
- Packaging: MIL-STD 2073.
- Inspection: Contractor is responsible for all inspection and testing per original manufacturer's specifications.
Contract & Timeline
- Type: Firm Fixed-Price (FFP) for repair services. Quotes limited to test and evaluation (T&E) will not be accepted.
- Response Due: February 25, 2026, by 4:30 PM EST.
- Published: January 28, 2026.
- Set-Aside: None specified.
- Contact: LEO.T.DOUGHERTY3.CIV@US.NAVY.MIL, 717-605-4614.
Key Requirements & Conditions
- Submission: Electronic submission of quotes, representations, and certifications via email to leo.t.dougherty3.civ@us.navy.mil.
- General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting.
- Authorized Source: Awardee must be an authorized repair source.
- Repair Turnaround Time (RTAT): The required RTAT is 200 days after receipt of asset (updated from 78 days).
- Price Reduction: A price reduction will be incurred per unit/per month for delays in meeting RTAT, unless excusable. Contractors must propose this amount.
- Quote Content: Quotes must include repair unit price, total price, RTAT, new unit price, T&E fee (if asset is Beyond Economical Repair/Beyond Repair), CAGE codes, cost breakdown, and a quote expiration date (minimum 90 days).
Evaluation
This requirement will utilize the Lowest Price Technically Acceptable (LPTA) source selection process. Proposals will first be evaluated for technical acceptability against performance work statement requirements. Technically acceptable proposals will then be evaluated based on price, with the award going to the responsible offeror offering the lowest price.