59--MOUNTING BASE,ELECT, IN REPAIR/MODIFICATION OF

SOL #: N0038325QD175Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT
PHILADELPHIA, PA, 19111-5098, United States

Place of Performance

Place of performance not available

NAICS

Machine Shops (332710)

PSC

Electrical Hardware And Supplies (5975)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 23, 2026
2
Submission Deadline
Feb 23, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVSUP Weapon Systems Support, has issued a solicitation for the repair and modification of MOUNTING BASE,ELECT (NSN 5975013980446, P/N 3244AS100). This opportunity requires contractors to return assets to a Ready for Issue (RFI) condition, adhering to specific repair procedures and quality standards. Proposals are due by February 23, 2026.

Scope of Work

This contract covers the repair, testing, and inspection of MOUNTING BASE,ELECT. Key aspects include:

  • Repair Process: Disassembly, cleaning, inspection, component repair/replacement, reassembly, and testing in accordance with the latest publications and repair processes/procedures.
  • Contractor Responsibility: Provide necessary facility, labor, materials, parts, and test/tooling equipment. All parts and materials must be new (FAR 52.211-5) unless Government Furnished Material (GFM) or approved otherwise.
  • Quality & Configuration: Establish and maintain a quality system conforming to ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or equivalent. A configuration management plan per NAVICPIA18 is required.
  • Specific Conditions: Detailed procedures for Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR) items are outlined, requiring Government concurrence for disposition or repair.
  • Storage & Packaging: Contractor must provide a proper enclosed warehouse environment. Packaging will adhere to MIL-STD 2073.

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: None specified.
  • Response Due: February 23, 2026, 8:30 PM EST.
  • Published Date: January 23, 2026.
  • Required Repair Turnaround Time (RTAT): 235 days after receipt of asset.
  • Induction Expiration Date: 365 days after contract award date.

Key Requirements

  • No repair deviation from approved written procedures without Basic Design Engineer review and PCO approval.
  • Contractor must specify the name and location of the facility performing the work (e.g., Raytheon, 6125 EAST21ST STREET INDIANAPOLIS IN 46219-9200).
  • Cannibalization of parts is not authorized unless specifically approved by NAVSUP WSS and the BDE.

Contact Information

For inquiries, contact Svitlana Shvets at 215-697-6278 or svitlana.shvets.civ@us.navy.mil.

People

Points of Contact

SVITLANA.SHVETS.CIV@US.NAVY.MILPRIMARY

Files

Files

View

Versions

Version 1Viewing
Solicitation
Posted: Jan 23, 2026
59--MOUNTING BASE,ELECT, IN REPAIR/MODIFICATION OF | GovScope