61--POWER SUPPLY

SOL #: SPMYM218Q0419Justification and Approval

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA MARITIME - PUGET SOUND
BREMERTON, WA, 98314-5000, United States

Place of Performance

Place of performance not available

NAICS

Relay and Industrial Control Manufacturing (335314)

PSC

Electric Wire, Power Distrib Eqpt (61)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 18, 2017
2
Last Updated
Dec 13, 2017

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Defense, specifically DLA MARITIME - PUGET SOUND under the Defense Logistics Agency, has issued a Solicitation for POWER SUPPLY (Product Service Code 61: Electric Wire, Power Distrib Eqpt). This opportunity was published on December 13, 2017.

Scope of Work

This solicitation is for the procurement of power supply equipment, categorized under Product Service Code 61, which includes electric wire and power distribution equipment. Further specific details regarding the scope of work are not available in the provided metadata.

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: None specified
  • Response Due: Not provided
  • Published: December 13, 2017

Evaluation

Details regarding evaluation criteria are not provided in the available metadata.

Additional Notes

For inquiries, please contact John Iversen at JOHN.IVERSEN@DLA.MIL or 360-476-3338.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 4
Solicitation
Posted: Dec 13, 2017
View
Version 3
Justification
Posted: Nov 18, 2017
View
Version 2Viewing
Justification and Approval
Posted: Nov 18, 2017
Version 1
Pre-Solicitation
Posted: Nov 18, 2017
View
61--POWER SUPPLY | GovScope