61 - POWER SUPPLY

SOL #: SPRMM1-26-P-KB10Award Notice

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
SPRMM1 DLA MECHANICSBURG
MECHANICSBURG, PA, 17055-0788, United States

Place of Performance

Place of performance not available

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Apr 20, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Mechanicsburg has awarded ARNOLD MAGNETICS CORPORATION a delivery order (SPRMM1-26-P-KB10) for POWER SUPPLY (NSN 7HH 6120-01-694-5070) valued at $786,429.39. This award was issued under Special Emergency Procurement Activity (SEPA) and Emergency Acquisition Flexibilities (EAF) authority.

Scope of Work

This delivery order specifies detailed technical requirements, packaging, and delivery schedules for the NSN 7HH 6120-01-694-5070 POWER SUPPLY. It is issued under a larger existing contract.

Contract & Timeline

  • Contracting Agency: DLA MECHANICSBURG
  • Awardee: ARNOLD MAGNETICS CORPORATION
  • Total Order Value: $786,429.39
  • Period of Performance: Deliveries are scheduled from April 2027 through August 2027.
  • FOB: ORIGIN
  • Set-Aside: Not specified for this particular delivery order, though the document notes "SMALL DISADVANTAGED" and "WOMEN-OWNED" as potential business types.
  • Award Date: April 20, 2026

Key Requirements & Deliverables

  • Item: POWER SUPPLY (NSN 7HH 6120-01-694-5070)
  • Technical Requirements: Detailed in Sections C, D, E, and Attachments of the original contract.
  • Packaging: Must comply with MIL-STD-2073, including potential electrostatic discharge (ESD) protection and specific marking for DLR items.
  • Inspection & Acceptance: Primarily at the contractor location (Source Inspection and Acceptance: 04879), with final acceptance by the Contract Administration Office (CAO) at the contractor's site. Destination acceptance is not authorized.

Additional Notes

  • Invoicing: Via Wide Area Workflow (WAWF).
  • Payment: Net 30 Days.
  • Contractors are advised to use the Electronic Document Access (EDA) web tool for orders, contracts, and modifications.
  • The document references numerous DFARS and FAR clauses, including those related to unique item identification, supply chain traceability, and cyber incident reporting.

People

Points of Contact

MATTHEW.CRACKER@DLA.MILPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Award Notice
Posted: Apr 20, 2026
61 - POWER SUPPLY | GovScope