6515--Patient Ceiling Lift Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) has issued a Special Notice announcing the cancellation of Solicitation Number 36C24426Q0498, titled "6515--Patient Ceiling Lift Replacement," effective immediately. No award will be issued from this solicitation.
Context of Original Solicitation
The cancelled solicitation sought proposals for the brand name or equal Guldmann fleet ceiling lift, track, rail, and pendant replacement at the Wilkes Barre VA Medical Center, PA. The project aimed to replace approximately 133 existing Liko ceiling lift systems to ensure a single standard of care and address parts availability issues. The scope included design, site evaluation, labor, materials, equipment, and installation, as well as the removal of pre-existing components. This opportunity was set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).
Impact of Cancellation
As a result of this cancellation, all previous deadlines, requirements, and submission instructions related to Solicitation 36C24426Q0498 are void. Interested parties should note that no award will be made under this specific solicitation.
Previously Associated Documents (for context)
Prior to cancellation, the solicitation included several key documents:
- FY26 FLOOR PLAN UPDATED 4-2-26: Provided a detailed floor plan and room-by-room inventory of existing ceiling lift systems, crucial for understanding the project scope.
- VHA DIRECTIVE 1611: Outlined the VA's "Safe Patient Handling and Mobility Program," establishing policy and requirements for patient handling.
- SOP 11IC.29: Detailed infection control compliance procedures for construction projects at the Wilkes-Barre VA Medical Center.
- Amendment 0001 (S06): Revised the Statement of Work to explicitly state that "No existing components from old lift system shall be utilized," requiring all OEM approved hardware for installation.
Contact Information
For any inquiries regarding this cancellation, please contact Tyler Kraft at tyler.kraft@va.gov or Andrea Aultman-Smith at andrea.aultman-smith@va.gov.