6530--BPA - Arjo Maxi Patient Ceiling Lifts
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) VISN 01, New England, has issued a Special Notice indicating its intent to award a sole-source Blanket Purchase Agreement (BPA) for Arjo Maxi Patient Ceiling Lifts and associated services. This action is justified under 10 U.S.C 2304(c)(1) due to only one responsible source (Arjo Inc.) being able to meet agency requirements, primarily driven by existing infrastructure compatibility. Interested parties must submit evidence of their capability to compete by April 27, 2026, at 11:00 AM EST.
Scope of Work
The requirement includes the procurement, delivery, installation, and training for new Arjo ceiling lift systems, parts, and accessories. The contractor will be responsible for:
- Providing all necessary personnel, equipment, supplies, and supervision.
- Developing detailed structural design and drawing documents adhering to VA directives and seismic requirements.
- Supplying operator's manuals, technical service manuals, troubleshooting guides, diagnostic software, schematic diagrams, and parts lists (hard and soft copy).
- Coordinating on-site installation and providing training.
- Disposing of material waste and packaging.
Contract Details
- Contract Type: Firm-Fixed-Price Single Award Blanket Purchase Agreement (BPA).
- Ordering Period: Five years (May 1, 2026, to April 30, 2031).
- Place of Performance: All VISN 1 locations, including VA Connecticut HCS, Manchester VAMC, VA Maine HCS, and Edith Nourse Rogers Memorial Veterans Hospital.
- Proposed Contractor: Arjo Inc.
Sole Source Justification
The VA's justification for a sole-source award to Arjo Inc. is based on the existing standardization of Arjo ceiling lift infrastructure across multiple VA Medical Centers in New England. Switching to a different manufacturer would incur significant costs and risks, including structural analysis, new hardware, installation, and potential disruption to veteran care. The justification also cites training requirements and the risk of clinical errors as reasons for maintaining standardization with Arjo lifts.
Response Instructions
This is a notice of intent, not a request for competitive proposals. However, interested parties may identify their interest and capability to respond to the requirement. Any response must provide clear and convincing evidence that competition would be advantageous to the Government.
Deadlines & Contact
- Response Due: April 27, 2026, 11:00 AM Eastern Standard Time (EST).
- Contact: Kim McCarthy, Contract Specialist, at kim.mccarthy@va.gov.