66--ACCELEROMETER,ELECT, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy (NAVSUP Weapon Systems Support Mech) has issued a Presolicitation Notice of Intent to award a sole-source contract for the repair/modification of Electrical Accelerometers (NSN 7H-6680-015589501-X5). This action is proposed under FAR 6.302-1, indicating the government's intent to solicit and negotiate with only one source. Interested parties must identify their interest and capability to respond within 45 days of the publication date (by June 19, 2026).
Scope of Work
The requirement is for the repair/modification of 10 kits of Electrical Accelerometers, identified by NSN 7H-6680-015589501-X5 and TDP VER 013. Delivery is FOB Origin. The product/service code is 6680 - Liquid And Gas Flow, Liquid Level, And Mechanical Motion Measuring Instruments.
Contract & Timeline
- Type: Presolicitation / Notice of Intent to Sole Source
- Authority: FAR 6.302-1 (Supplies or services available from only one responsible source)
- Justification: The Government does not own the data rights, and reverse engineering is deemed uneconomical.
- Response Deadline: 45 days from publication (June 19, 2026)
- Published Date: May 5, 2026
Evaluation
This notice is not a request for competitive proposals. All proposals, quotations, or capability statements received within the 45-day period will be considered solely for the purpose of determining whether to conduct a competitive procurement. A determination by the Government not to compete based on responses is solely within its discretion.