66--COMPUTER SYSTEM,SPE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation has issued a notice of intent to sole-source the procurement of 20 units of a specialized Computer System (NSN 7R-6605-016815863-BL). This item is classified as flight-critical and requires specific engineering source approval. Responses are due by February 26, 2026.
Scope of Work
The requirement is for the delivery of 20 EA of NSN 7R-6605-016815863-BL (Ref Nr 343A560-1). Key requirements include:
- FOB Origin delivery.
- Maintenance of high-quality standards due to the flight-critical nature of the part.
- Utilization of existing unique design capabilities and manufacturing knowledge held by approved sources.
Contract & Timeline
- Type: Presolicitation (Notice of Intent to Sole Source under FAR 6.302-1)
- Quantity: 20 Units
- Set-Aside: None specified
- Response Due: February 26, 2026
- Published: February 11, 2026
Qualification & Evaluation
Because the technical data is not economically available to the Government, only previously approved sources are currently solicited. However, the Government will consider capability statements or proposals from alternate sources.
New Source Requirements:
- Prospective vendors must qualify according to the design control activity's procedures.
- If not already approved, vendors must submit a Source Approval Request (SAR) package as detailed in the NAVSUP Weapon Systems Support (NAVSUP WSS) brochures.
- Evaluation of new sources may not be delayed if it impacts Fleet support needs.
Additional Notes
This notice is not a request for competitive proposals; however, all responses received within 45 days of publication will be considered to determine if a competitive procurement is feasible.