66--FBP TEST PROBE ADPT- AND SIMILAR REPLACEMENT PARTS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP Weapon Systems Support Mech is seeking proposals for FBP Test Probe Adapters and similar replacement parts. This Total Small Business Set-Aside solicitation requires the manufacture of specific parts, including the FBP TEST PROBE ADPT (p/n FBPT-MIL-2CPA) and BARREL ASSY, FBP (p/n FBPP-BAP1), adhering to military standards. Proposals are due March 30, 2026.
Scope of Work
This solicitation covers the manufacture of:
- FBP TEST PROBE ADPT (p/n FBPT-MIL-2CPA, cage 1QLU8)
- BARREL ASSY, FBP (p/n FBPP-BAP1, cage 1QLU8) Requirements include adherence to material and physical specifications, marking in accordance with MIL-STD-130, MIL-STD-1285, MIL-STD-454, and MIL-P-15024/5. Configuration control must follow MIL-STD-973. Government Source Inspection per FAR 52.246-2 is required.
Contract & Timeline
- Type: Solicitation (for replacement parts)
- Delivery: 90 days after award
- Set-Aside: Total Small Business
- Proposal Due: March 30, 2026, 8:30 PM ET
- Published: January 7, 2026, 5:30 PM ET
Evaluation
Award will be based on the total dollar value, not individual items. The solicitation mentions "Commercial Brand Name Description" and allows for alternate items if a complete technical description is submitted for government review. Awards for items described on Source Control Drawings (SCD) will only be made to vendors listed on the SCD, with prior testing and approval required for substitute items.
Additional Notes
Contractual documents are considered "issued" when deposited in mail, transmitted by facsimile, or sent by other electronic commerce methods. The contractor is responsible for all inspection requirements, maintaining records for 365 days after final delivery. Packaging must comply with MIL-STD 2073.