66--TRANSMITTER,PRESSUR, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support, has issued a solicitation for the repair and modification of TRANSMITTER,PRESSUR (NSN 6685-01-605-0946). This requirement involves returning unserviceable items to a Ready For Issue (RFI) condition through comprehensive repair, testing, and inspection procedures. The solicitation submission date has been extended to July 31, 2026.
Scope of Work
The contractor will be responsible for the repair, testing, and inspection of the specified items, including component repair, replacement, and reassembly. This includes providing all necessary facilities, labor, materials, parts, and test/tooling equipment. Key responsibilities include:
- Repair Turnaround Time (RTAT): Measured from asset physical receipt to acceptance, with specific daily requirements to be proposed by the contractor.
- Throughput Constraint: Contractors must specify monthly repair capacity.
- Material Requirements: All parts and materials must be new, in accordance with FAR 52.211-5, unless written approval for alternatives is obtained. MIL-W-81381 wire is prohibited; SAE-AS22759 series wire must be used.
- Quality Requirements: Establish and maintain a quality system conforming to ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or equivalent.
- Configuration Management: Maintain a configuration management plan per NAVICPIA18.
- Definitions: Detailed definitions are provided for Overhaul, Repair, Beyond Economical Repair (BER), Missing on Induction (MOI), and Over and Above Repair (OAR), outlining specific procedures for each.
Contract & Timeline
- Type: Solicitation for repair services.
- Set-Aside: None specified.
- Induction Expiration Date: 365 days after contract award.
- Early/Incremental Deliveries: Accepted and preferred.
- Solicitation Due: July 31, 2026.
- Published: May 13, 2026 (latest amendment date).
Additional Notes
The contractor is responsible for all equipment, fixtures, jigs, dies, patterns, mylars, special tooling, and test equipment. Changes to manuals, drawings, specifications, or repair sources require Procuring Contracting Officer (PCO) approval. The contractor must specify the source and location of the repair facility.