8th AF HQ Chiller

SOL #: FA460826QC055Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4608 2 CONS LGC
BARKSDALE AFB, LA, 71110-2438, United States

Place of Performance

Fort Johnson, LA

NAICS

Plumbing (238220)

PSC

Air Conditioning Equipment (4120)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 13, 2026
2
Submission Deadline
May 1, 2026, 6:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 2 CONS LGC office, is soliciting quotes for one (1) Brand Name Trane 160-Ton Air-Cooled Scroll Packaged Chiller Model (CGAM) for the 2d Civil Engineering Squadron (2 CES) at Barksdale AFB, LA. This acquisition, under solicitation number FA460826QC055, is a Total Small Business Set-Aside. Quotes are due Friday, May 1, 2026, at 1:30 PM CDT.

Scope of Work

This requirement involves the purchase and delivery of a single Trane 160-Ton Air-Cooled Scroll Packaged Chiller Model (CGAM). The chiller must strictly conform to the customer's salient characteristics, which are detailed in Attachment 2. Installation of the chiller will be performed by members of the 2 CES. Delivery terms are Freight on Board (FOB) Destination.

Contract Details

  • Solicitation Type: Combined Synopsis/Solicitation (Request for Quote - RFQ)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Funding: Funds are not presently available for this effort. Any award is contingent upon fund availability. The government explicitly reserves the right to cancel this solicitation, either before or after the closing date, without obligation to reimburse offerors for any costs incurred.
  • Award Basis: Contract award will be based on a best value determination, considering both price and technical factors. The government intends to award without discussions.
  • Broader Context: A Justification and Approval (J&A) document (Attachment 3) outlines a Department of the Air Force strategy to standardize HVAC chillers across installations, with an estimated value of $437.5M for Oct 2024 through Sep 2029. This strategy justifies brand-name specific procurements to reduce Total Cost of Ownership, while maintaining competition among authorized local distributors.

Submission & Evaluation

  • Questions Due: Friday, April 24, 2026, by 1:30 PM Central Daylight.
  • Answers Provided: On or around Tuesday, April 28, 2026.
  • Quotes Due: Friday, May 1, 2026, by 1:30 PM CDT.
  • Submission Method: All questions and quotes must be submitted via email to the Contract Specialist and Contracting Officer.
  • Evaluation Factors: Price and Technical capabilities. The lowest three offerors will undergo a technical evaluation. Clause 52.212-2 (Evaluation-Commercial Products and Commercial Services) applies, as detailed in Attachment 1.
  • Attachments: Applicable attachments include Attachment 1 (Provisions and Clauses), Attachment 2 (Salient Characteristics), and Attachment 3 (Justification And Approval).

Points of Contact

People

Points of Contact

SSgt Ashley LamarPRIMARY
TSgt Randy TedrowSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
8th AF HQ Chiller | GovScope