99--RECIEVER, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is an amendment to a Department of the Navy, NAVSUP Weapon Systems Support solicitation for the repair/modification of receivers. The primary purpose of this amendment is to combine requirements and increase the total unit repair quantity from 10 to 22 units (EA). A new line item, PD Line N0038326U0437; QTY 12 (EA), has been added. Responses are due by April 27, 2026.
Scope of Change
This amendment significantly modifies the scope by increasing the required repair quantity. Key details include:
- Quantity Increase: Total repair units increased from 10 to 22 (EA).
- New Line Item: PD Line N0038326U0437, quantity 12 (EA), is added in its entirety.
- Repair Turnaround Time (RTAT): Defined as 90 days after physical receipt of the F-condition asset at the contractor's facility, as reflected in the Commercial Asset Visibility (CAV) system. The contractor must obtain final inspection and acceptance by the Government within this RTAT.
- Throughput Constraint: Contractors are required to provide a throughput constraint for each National Stock Number (NSN), indicating the total assets to be repaired monthly after initial delivery commences. A throughput of XXX per month reflects no constraint.
- Expiration Date: The authorization for repair extends 365 days after the contract award date. Assets received after this period require bilateral agreement for repair.
Contract & Timeline
- Type: Solicitation (Amendment)
- Response Due: April 27, 2026, 8:00 PM Z
- Published: May 4, 2026, 8:08 PM Z
- Set-Aside: None specified.
Additional Notes
All other terms and conditions of the original solicitation remain unchanged. Contractual documents will be issued electronically (mail, facsimile, or email). Early and incremental deliveries are accepted and preferred. A reconciliation modification will be issued post-contract for price adjustments if the contractor fails to meet the established RTATs, which may also lead to other remedies for the Government.