A-10 SKIN PN: 160D611502-8 NSN: 1560-01-124-4882FJ

SOL #: FA8212-22-R-0009Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8212 AFSC OLH PZABA
HILL AFB, UT, 84056, United States

Place of Performance

Place of performance not available

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Airframe Structural Components (1560)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 2, 2022
2
Last Updated
Jun 6, 2022
3
Submission Deadline
Apr 18, 2022, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This is a formal solicitation or a Request For Proposal (RFP).  The RFP is in accordance with Federal contract law.      

Requirement: PN: 160D611502-8 NSN: 1560-01-124-4882FJ (MIN Qty 78 EA (includes first article)/ MAX Qty 228EA).  Higher level contract quality certification required.  Potential offerors must submit AS9100 certification or higher with the bid and with the Source Approval Request (SAR), if not a qualified manufacturer.    

Acquisition Type: Full & Open Competition to Qualified Manufacturers – Total Small Business Set-Aside. 

Contract Type: FFP Single-Award IDIQ with a five year ordering period

Acquistion Threshold and Scope: Per the Independent Government Estimate (IGE) the total estimated acquisition value is less than $5M threshold and thus, the Government does not have the authority and clearance to exceed this acquisition scope.  Foreign participation is NOT permitted at the prime contractor level. 

Acquistion Schedule: Post Synopsis 2-16 MAR2022; post RFP 17MAR2022-18APR2022; award NLT 30 days after RFP close-out date or by 17MAY2022.

Technical Data Package (TDP) Access:  Offers shall be IAW the current TDP.   The TDP is attached to the RFP SECTION J via RFP Amendment 0001. Please let the PCO know if there are any specs/drawings missing.      

Acquisition Subject to Qualification Requirement.  Replenishment parts must be acquired so as to ensure the safe, dependable, and effective operation of the military aircraft, the A-10s, and thus military aircraft parts are subject to qualification requirements per FAR 17.7, Acquisition of Replenishment Parts and FAR 9.2, Qualification Requirements.  Potential offerors must be qualified manufacturer(s) to bid. Potential offerors may submit a Source Approval Request (SAR) per the attached Source Qualification Statement Spares (SQSS).  All responsible qualified manufacturers may submit a bid, proposal, or quotation which shall be considered by the agency.  As prescribed in FAR 9.202 (e) and (d), the Contracting Officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification nor refer challenges to the qualification requirements to the small business administration. 

CLIN 0001: MIN QTY 78EA

CLIN 0001 PN: 160D611502-8 NSN: 1560-01-124-4882FJ

CLIN 0001AA Production Articles 77EA

CLIN 0001AB First Article 1EA

CLIN 0002: ADDITIONAL QTY 150EA (MAX QTY) 

Contractor shall state minimum qty per order (if applicable, if not applicable "N/A") Min Qty____.  Unit price sheet for each out years (after FA acceptance, if required): Yr 1 (FY2023) $____; Yr 2 (FY2024) $____; Yr 3 (FY2025) $_____; Yr 4 (FY2026) $_____

CLIN 0003 FATR CDRL (NSP)

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 22
Solicitation
Posted: Jun 6, 2022
View
Version 21
Solicitation
Posted: May 19, 2022
View
Version 20
Solicitation
Posted: May 3, 2022
View
Version 19
Solicitation
Posted: May 3, 2022
View
Version 18
Solicitation
Posted: May 3, 2022
View
Version 17
Solicitation
Posted: Apr 14, 2022
View
Version 16
Solicitation
Posted: Apr 13, 2022
View
Version 15Viewing
Solicitation
Posted: Apr 12, 2022
Version 14
Solicitation
Posted: Mar 31, 2022
View
Version 13
Pre-Solicitation
Posted: Mar 31, 2022
View
Version 12
Pre-Solicitation
Posted: Mar 30, 2022
View
Version 11
Pre-Solicitation
Posted: Mar 29, 2022
View
Version 10
Pre-Solicitation
Posted: Mar 29, 2022
View
Version 9
Solicitation
Posted: Mar 17, 2022
View
Version 8
Pre-Solicitation
Posted: Mar 10, 2022
View
Version 7
Pre-Solicitation
Posted: Mar 9, 2022
View
Version 6
Pre-Solicitation
Posted: Mar 9, 2022
View
Version 5
Pre-Solicitation
Posted: Mar 7, 2022
View
Version 4
Pre-Solicitation
Posted: Mar 7, 2022
View
Version 3
Pre-Solicitation
Posted: Mar 3, 2022
View
Version 2
Pre-Solicitation
Posted: Mar 3, 2022
View
Version 1
Pre-Solicitation
Posted: Mar 2, 2022
View