Access Floor Power Boxes and Power Whips

SOL #: W911S226U2509Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT DRUM
FORT DRUM, NY, 13602-5220, United States

Place of Performance

Place of performance not available

NAICS

All Other Miscellaneous Electrical Equipment and Component Manufacturing (335999)

PSC

Miscellaneous Electric Power And Distribution Equipment (6150)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 3, 2026
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 10, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army (W6QM MICC-FT DRUM) has issued a Combined Synopsis/Solicitation for Access Floor Power Boxes and Power Whips for DODAFB. This opportunity is designated as a Total Small Business Set-Aside (FAR 19.5). Responses are due by February 10, 2026, at 6:00 PM EST.

Scope of Work

This requirement is for the provision of access floor boxes and associated power whips. The original notice was amended to change the NAICS code.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 6150 (Miscellaneous Electric Power And Distribution Equipment)
  • Response Due: February 10, 2026, 6:00 PM EST
  • Published: February 4, 2026

Contact Information

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 4, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View