Actuator, Electro-Mechanical, Rotary
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
EXCEPTION TO SYNOPSIS
FAR 5.202(a) (13) (i)
The contracting officer need not submit the notice required by 5.201 when - -
(a) The contracting officer determines that - -
(13) The proposed contract action - -
(i) Is for an amount not expected to exceed the simplified
acquisition threshold;
(ii) Will be made through a means that provides access to the notice
of proposed contract action through the GPE; and
(iii) Permits the public to respond to the solicitation electronically
In accordance with the exception at FAR 5.202 (a)(13) this requirement is exempt
from the synopsis requirement as it is not expected to exceed the simplified
acquisition threshold, it will be posted to SAM.gov, and the public can respond to
the solicitation electronically.