Aerial Work Platform Single Person Lift

SOL #: W911S225U1014Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT DRUM
FORT DRUM, NY, 13602-5220, United States

Place of Performance

Place of performance not available

NAICS

All Other Miscellaneous Electrical Equipment and Component Manufacturing (335999)

PSC

Miscellaneous Maintenance And Repair Shop Specialized Equipment (4940)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 26, 2025
2
Last Updated
Jun 27, 2025
3
Submission Deadline
Jul 3, 2025, 3:35 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

1ea 120V AC Aerial Work Platform1ea 12V DC Aerial Work PlatformSpecifications:Working height 35ft Min 35ft 6in MaxPlatform height 29ft - 29ft 6inHeight - stowed (Standard):6ft Min to 6 ft 9 in MaxLength - stowed (Standard): 4ft Min to 4 ft 5 in MaxWidth (Standard):2ft Min to 2 ft 5 in MaxWidth (RT): 2ft Min to 2ft 6in MaxWidth (Narrow); 1ft Min to 1ft 11in MaxLift capacity; 300lb min to 350lb MaxIndoor:Outrigger footprint (l/w) (Standard): 6 ft 4 in/5 ft 8inCorner access*** (Standard): 1 ft 10 inWall access front/side (Standard): 8in/1 ft 9 inOutdoor:Outrigger footprint (l/w) (Standard): 9 ft 9 in/9 ft 2inCorner access*** (Standard): 2 ft 3 inWall access front/side (Standard): 2 ft 3 in/3ft 6inPlatform Dimension:Standard 27/26/44.75Gated Standard 27/26/44.75Power: 12V/110/50-60 Hz after award to be able to deliver within 14 days during Monday-Friday between 8am-3pm PST. Driver must meet Federal requirement to enter federal installation.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Jun 27, 2025
View
Version 3
Combined Synopsis/Solicitation
Posted: Jun 27, 2025
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jun 27, 2025
Version 1
Combined Synopsis/Solicitation
Posted: Jun 26, 2025
View