- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (AFLCMC/ESAN) is conducting a Sources Sought/Request for Information (RFI) to identify potential sources for the acquisition, repair, and replacement of runway and airfield lighting systems at Beni Suef Air Base (AB), Egypt. This market research aims to improve night and low-light operational capabilities. Responses are due by March 6, 2026.
Scope of Work
The effort involves replacing existing airfield lighting systems on runways 36R/18L and 05/23, associated ramps, and taxiways. All parts and materials must be provided by Youyang Airfield Lighting Equipment, Inc. Key tasks include:
- Main Runway (36R/18L): Replace halogen lighting with Youyang LED system, replace distance remaining signage and PAPI, utilizing existing infrastructure where feasible.
- Alternate Runway (36L/18R): Repair damaged handholds and adjust red runway end lights.
- Taxiway & Apron Lighting: Replace all halogen taxiway lights at 32 shelters and six taxiways, replace apron lighting, provide identification signage, and ensure proper drainage.
- Electrical Systems: Replace Constant Current Regulators (CCRs), provide climate control for CCR room, replace Automatic Transfer Switch (ATS), connect secondary generator, and install phones in CCR/generator rooms.
- Control Systems: Update the Airfield Lighting Control & Monitoring System (ALCMS) with a new map, replace tower control system and cabling, and replace CCR control panels.
- Support: Provide maintainer and operator training, two years of spare parts and consumables, and all required commissioning activities.
Contract & Timeline
- Type: Sources Sought / Request for Information (RFI)
- Set-Aside: None specified (market research stage)
- Response Due: March 6, 2026, 5:00 PM EST
- Published: January 22, 2026
Evaluation
Responses will be used for planning and market research to develop an acquisition strategy, statement of work, and associated specifications. The government will assess interest, small business status, capabilities, and recent experience (last 5 years) in providing similar runway lighting solutions. Respondents should detail existing solutions, ability to alter solutions, training experience, sustainment support, estimated costs, and timelines.
Additional Notes
This RFI is for informational purposes only and does not constitute a Request for Proposal (RFP) or a commitment to issue one. The government will not pay for any costs incurred in responding. Submissions should be UNCLASSIFIED PDFs, not exceeding 25 single-spaced pages, 12pt Times New Roman. Proprietary information should be clearly identified. Responses should be emailed to Kelsey.Ribeiro@us.af.mil and Brendan.Pacelli.2@us.af.mil.