Air Traffic Control and Landing System Equipment Upgrade
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for the Air Traffic Control and Landing System (ATCALS) Equipment Infrastructure Upgrade at Hill Air Force Base, UT, and the Utah Test and Training Range (UTTR). This is a Total Small Business Set-Aside opportunity for a Firm Fixed-Price contract. The project involves engineering, furnishing, installing, and testing (EFI&T) new infrastructure. Proposals are due April 22, 2026, at 2:00 PM MDT.
Scope of Work
This requirement, identified as a new project, focuses on upgrading the ATCALS equipment infrastructure. The contractor will be responsible for the EFI&T of new fiber optic cable infrastructure, including underground conduit systems, maintenance holes, and fiber optic distribution panels. This also entails splicing and termination of single-mode fiber optic cables, ensuring compliance with TIA telecommunication standards and base installation standards. Restoration of disturbed grounds is also required. Bidders should note the inclusion of maps detailing PFAS contamination areas at the North and South Runways, which may be relevant to the environmental context of the work.
Contract & Timeline
- Contract Type: Firm Fixed-Price
- Period of Performance: Approximately one year, from May 15, 2026, to May 14, 2027.
- Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a size standard of $19.0 million.
- Place of Performance: Hill Air Force Base, UT.
Submission & Evaluation
- Proposal Submission Deadline: April 22, 2026, at 2:00 PM MDT. Proposals must be submitted electronically to jonathan.visounnaraj@us.af.mil.
- Evaluation Factors: Award will be based on a Lowest Price Technically Acceptable (LPTA) methodology. Price will be ranked, and only the lowest-priced proposal will be evaluated for technical acceptability on a pass/fail basis, ensuring all Statement of Objectives (SOO) requirements are met.
Key Dates & Actions
- Site Visit: April 8, 2026, at 8:00 AM MDT. Interested parties must RSVP by April 2, 2026, at 2:00 PM MDT, providing names, DOB, driver's license number, and state of issuance to jonathan.visounnaraj@us.af.mil. Limit of 3 employees per company.
- Questions Due: April 13, 2026, at 10:00 AM MDT, submitted in writing to jonathan.visounnaraj@us.af.mil.
- Final Q&A Posted: April 16, 2026.
Additional Notes
The solicitation includes a U.S. Department of Labor Wage Determination for Utah counties (Davis, Morgan, Weber), which is critical for proposal pricing. A Contract Data Requirements List (CDRL) details specific reporting and documentation requirements. This is a new requirement, not a renewal of an existing contract.