Update January 30, 2026 - Aircraft Lease to Support NASA’s Spaceflight Imaging Activities

SOL #: SCIFLI2026Sources Sought

Overview

Buyer

National Aeronautics And Space Administration
National Aeronautics And Space Administration
NASA LANGLEY RESEARCH CENTER
HAMPTON, VA, 23681, United States

Place of Performance

Hampton, VA

NAICS

Commercial Air (532411)

PSC

Lease Or Rental Of Equipment: Aircraft And Airframe Structural Components (W015)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 14, 2025
2
Last Updated
Jan 30, 2026
3
Response Deadline
Nov 25, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

NASA Langley Research Center (LaRC) issued a Sources Sought (RFI) for the lease of two aircraft to support its Scientifically Calibrated In-Flight Imagery (SCIFLI) team for airborne imaging missions. However, as of January 30, 2026, this RFI is considered closed. NASA LaRC does not intend to issue a solicitation specifically for this requirement but will consider the input received for future acquisition planning of aircraft resources.

Original Scope of Work

The RFI sought an exclusive dry lease for up to two aircraft, primarily Gulfstream V (G-V) or equivalent military variants, with consideration for a G-IV/G-V combination. These aircraft would be structurally modified by NASA to integrate custom EO/IR sensor systems and electronics, supporting critical flight phases like hypersonic reentry and parachute deployment for human spaceflight activities, including the Artemis II Orion reentry. One aircraft required high-speed internet connectivity (>=15 Mbps upload).

Original Contract & Timeline

  • Type: Sources Sought / Request for Information (RFI)
  • Anticipated Lease Type: Exclusive Dry Lease
  • Anticipated Period of Performance: Mid-January 2026 award, February 10, 2026 lease start. A minimum guaranteed base period of two months with options for monthly extensions up to a total continuous term of six months.
  • Original Response Due: November 25, 2025 (or sooner)
  • Published Date: January 30, 2026 (Date of RFI closure update)
  • Set-Aside: None specified

Key Original Requirements

Contractor/Lessor Responsibilities:

  • Provide up to two aircraft meeting minimum specifications (e.g., G-V, one with >=15 Mbps internet).
  • Ensure pre-delivery configuration and conduct pre/post lease inspections.
  • Aircraft must be free of calendar/hourly maintenance inspections for the entire lease duration (up to 6 months).
  • FOB origin at contractor's facility.

Government/Lessee Responsibilities:

  • Exclusive use and operational control.
  • Ensuring airworthiness, modifying/recertifying aircraft, and performing all maintenance.
  • Providing crewmembers and de-modifying aircraft before return.

Additional Notes

This RFI was for market research and planning purposes only. No solicitation exists, and interested firms were advised not to request one. The input gathered will inform future acquisition strategies for aircraft resources.

People

Points of Contact

CJ ScottPRIMARY
Rich CannellaSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 2Viewing
Sources Sought
Posted: Jan 30, 2026
Version 1
Sources Sought
Posted: Nov 14, 2025
View
Update January 30, 2026 - Aircraft Lease to Support NASA’s Spaceflight Imaging Activities | GovScope